Presentation For PSAST May 14, 2010
2
Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief Jo-Monroe 500kV
3
Most Limiting N-1-X Events Studied Winter 1500 MW South to North, With 680 MW Puget Sound Area Generation Showing All Lines In Service, Followed By A Primary N-1 Event, And Then A Secondary Contingency (N-1 or Common Mode) For Each Condition, A Series of Power Flow Plots Are Shown Attempt To Relieve Overloads By Reducing Transfers Verify Adequacy of Proposed Solutions
4
1500 MW Winter S-N, 680 MW Area Gen All lines in service
5
All Lines In Service
7
Primary Contingency Now Take Monroe 500/230 kV Transformer Out of Service
8
1500 MW Winter S-N, 680 MW Area Gen N-1: Monroe 500/230 kV
9
Monroe 500/230 kV O/S
11
Secondary Contingency Monroe 500/230 kV Transformer is Out of Service Now Take SnoKing 230 kV South Bus Breaker Failure
12
1500 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus (No Bothell-SnoKing RAS)
13
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus No Bothell-SnoKing RAS
14
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus No Bothell-SnoKing RAS
15
1500 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus (with Bothell-SnoKing RAS)
16
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus Bothell-SnoKing RAS
17
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus Bothell-SnoKing RAS
18
Try to Resolve Overloads First Reduce Transfers to BC Then Test Proposed Projects
19
1000 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus (with Bothell-SnoKing RAS)
20
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
21
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
22
500 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus (with Bothell-SnoKing RAS)
23
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
24
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
25
250 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus (with Bothell-SnoKing RAS)
26
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
27
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
28
0 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus (with Bothell-SnoKing RAS)
29
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
30
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus
31
Adding Projects First, SCL Series Cable Reactors Then, Bothell-SnoKing-Maple Valley Reconductor
32
1500 MW Winter S-N, 680 MW Area Gen SCL Series Cable Reactors Added All lines in service
33
All Lines In Service SCL Series Cable Reactors Added
34
All Lines In Service SCL Series Cable Reactors Added
35
1500 MW Winter S-N, 680 MW Area Gen SCL Series Cable Reactors Added N-1: Monroe 500/230 kV
36
Monroe 500/230 kV O/S SCL Series Cable Reactors Added
37
Monroe 500/230 kV O/S SCL Series Cable Reactors Added
38
1500 MW Winter S-N, 680 MW Area Gen SCL Series Cable Reactors Added N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus (with Bothell-SnoKing RAS)
39
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus SCL Series Cable Reactors Added
40
Monroe 500/230 kV O/S BF SnoKing 230kV South Bus SCL Series Cable Reactors Added
41
1500 MW Winter S-N, 680 MW Area Gen SCL Series Cable Reactors Added Bothell-SnoKing-MapleValley Reconductor N-1-X: Monroe 500/230 kV And BF SnoKing 230 kV South Bus
42
Primary Contingency Take Tacoma 500/230 kV Transformer Out of Service
43
1500 MW Winter S-N, 680 MW Area Gen N-1: Tacoma 500/230 kV
44
Tacoma 500/230 kV O/S
46
N-1-X Primary Outage: Tacoma 500/230 kV Transformer Secondary Outage: BF Maple Valley 230kV Bus Sections #1, 2
47
1500 MW Winter S-N, 680 MW Area Gen N-1-X: Tacoma 500/230 kV And BF Maple Valley 230kV Bus Sections #1, 2
48
Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
49
Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
50
Try to Resolve Overloads First Reduce Transfers to BC Then Test Proposed Projects
51
1000 MW Winter S-N, 680 MW Area Gen N-1-X: Tacoma 500/230 kV And BF Maple Valley 230kV Bus Sections #1, 2
52
Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
53
Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
54
0 MW Winter S-N, 680 MW Area Gen N-1-X: Tacoma 500/230 kV And BF Maple Valley 230kV Bus Sections #1, 2
55
Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
56
Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
57
Adding Projects Third Covington 500/230kV Transformer Or Second Maple Valley 500/230 kV Transformer
58
1500 MW Winter S-N, 680 MW Area Gen 3 rd Covington 500/230 kV Transformer Added N-1-X: Tacoma 500/230 kV And BF Maple Valley 230kV Bus Sections #1, 2
59
3 rd Covington xfmr Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
60
1500 MW Winter S-N, 680 MW Area Gen 2 nd Maple Valley 500/230 kV Transformer Added N-1-X: Tacoma 500/230 kV And BF Maple Valley 230kV Bus Sections #1, 2
61
2 nd Maple Valley xfmr Tacoma 500/230 kV O/S BF Maple Valley 230kV #1,2
62
Primary Outage Take Maple Valley 500/230 kV Transformer Out of Service
63
1500 MW Winter S-N, 680 MW Area Gen N-1: Maple Valley 500/230 kV
64
Maple Valley 500/230 kV O/S
66
N-1-X Primary Outage: Maple Valley 500/230 kV transformer Secondary Outage: N-2: Raver - Covington #1&2 500kV
67
Maple Valley 500/230 kV O/S And N-2: Raver – Covington #1&2 500kV
68
Try to Resolve Overloads First Reduce Transfers to BC Then Test Proposed Projects
69
Maple Valley 500/230 kV O/S And N-2: Raver – Covington #1&2 500kV
70
Maple Valley 500/230 kV O/S And N-2: Raver – Covington #1&2 500kV
71
Adding Projects Third Covington 500/230kV transformer Or Second Maple Valley 500/230 kV transformer
72
Maple Valley 500/230 kV O/S And N-2: Raver – Covington #1&2 500kV 3 rd Covington 500/230 kV Transformer Added
73
Maple Valley 500/230 kV O/S And N-2: Raver – Covington #1&2 500kV 2 nd Maple Valley 500/230 kV Transformer Added
74
Primary Contingency Take Chief Jo-Snohomish 345 kV Out of Service
75
1500 MW Winter S-N, 680 MW Area Gen N-1: Chief Jo-Snohomish 345 kV
76
Chief Jo-Snohomish 345kV O/S
77
N-1-X Primary Outage: Chief Jo-Snohomish 345 kV Out of Service Secondary Outage: BF 4526 Echo Lake-Monroe-Custer
78
1500 MW Winter S-N, 680 MW Area Gen Chief Jo-Snohomish 345 kV O/S BF 4526 Echo Lake-Monroe-Custer
79
Chief Jo-Snohomish 345kV O/S BF 4526 Echo Lake-Monroe-Custer
80
Try to Resolve Overloads First Reduce Transfers to BC Then Test Proposed Projects
81
1000 MW Winter S-N, 680 MW Area Gen Chief Jo-Snohomish 345 kV O/S BF 4526 Echo Lake-Monroe-Custer
82
Chief Jo-Snohomish 345kV O/S BF 4526 Echo Lake-Monroe-Custer
83
0 MW Winter S-N, 680 MW Area Gen Chief Jo-Snohomish 345 kV O/S BF 4526 Echo Lake-Monroe-Custer
84
Chief Jo-Snohomish 345kV O/S BF 4526 Echo Lake-Monroe-Custer
85
Adding Projects First Add SCL Series Cable Reactors Then Add Bothell-SnoKing-Maple Valley Reconductor
86
1500 MW Winter S-N, 680 MW Area Gen Chief Jo-Snohomish 345 kV O/S BF 4526 Echo Lake-Monroe-Custer SCL Series Cable Reactors Added
87
Chief Jo-Snohomish 345kV O/S BF 4526 Echo Lake-Monroe-Custer SCL Series Cable Reactors Added
88
1500 MW Winter S-N, 680 MW Area Gen Chief Jo-Snohomish 345 kV O/S BF 4526 Echo Lake-Monroe-Custer SCL Series Cable Reactors Added Bothell-SnoKing-Maple Valley Reconductor
89
Chief Jo-Snohomish 345kV O/S BF 4526 Echo Lake-Monroe-Custer SCL Series Cable Reactors Added, Bothell-SnoKing-Maple Valley Reconductor
90
Primary Contingency Take Monroe-Echo Lake 500 kV Three Terminal Line Out of Service
91
1500 MW Winter S-N, 680 MW Area Gen N-1: Monroe-Echo Lake 500 kV
92
Monroe-Echo Lake O/S
93
850 MW Winter S-N, 680 MW Area Gen N-1: Monroe-Echo Lake 500 kV
94
Monroe-Echo Lake O/S
95
N-1-X Primary Outage: Monroe-Echo Lake 500 kV Three Terminal Line Secondary Outage: Chief Jo-Monroe 500 kV Unable to Solve Case Unless Transfers are Limited to 850 MW
96
850 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe-Echo Lake 500 kV And Chief Jo-Monroe 500 kV
97
Monroe-Echo Lake O/S N-1 Chief Jo-Monroe 500 kV
98
Try to Resolve Overloads First Reduce Transfers to BC Then Test Proposed Projects
99
0 MW Winter S-N, 680 MW Area Gen N-1-X: Monroe-Echo Lake 500 kV And Chief Jo-Monroe 500 kV
100
Monroe-Echo Lake O/S N-1 Chief Jo-Monroe 500 kV
101
Adding Projects SCL Series Cable Reactors And Bothell-SnoKing-Maple Valley Reconductor Can Solve Case at 900 MW Transfer
102
900 MW Winter S-N, 680 MW Area Gen Monroe-Echo Lake 500 kV O/S N-1 Chief Jo-Monroe 500 kV SCL Series Cable Reactors And Bothell-SnoKing-Maple Valley Reconductor Added
103
Monroe-Echo Lake O/S N-1 Chief Jo-Monroe 500 kV Projects Added
104
Voltage Limitations What Is Required For The Double Outage Of Monroe-Echo Lake 500 kV and Chief Jo-Monroe 500 kV?
105
All Lines In Service 1500 MW South to North North Puget Sound Area
107
Monroe-Echo Lake Out of Service 1500 MW South to North North Puget Sound Area
109
Open Chief Jo-Monroe 500kV 1500 MW South to North Does Not Converge Reduce Transfers to 1000 MW South to North
111
Open Chief Jo-Monroe 500kV 1000 MW South to North Does Not Converge Reduce Transfers to 500 MW South to North
113
Open Chief Jo-Monroe 500kV 500 MW South to North Voltage at Monroe 500kV Increases 2.5% from 525kV to 538kV (caps switching) Many Thermal Overloads, Including: 142% Mass Transformer 230/115kV (244 MVA) 139% Mass-Union 115kV (1656 amps) 138% Union-Broad 115kV (1654 amps) 129% Maple Valley-SnoKing 230kV (1667 amps)
115
PV Analysis
117
PV Analysis (With SCL Reactors and Bothell-SnoKing-Maple Valley ReConductor)