Presentation is loading. Please wait.

Presentation is loading. Please wait.

Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER.

Similar presentations


Presentation on theme: "Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER."— Presentation transcript:

1 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER

2 JACKET LOADS OUT ONTO THE BARGE

3 BARGE DEBALLASTS

4 BARGE DEBALLASTS

5 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

6 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

7 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

8 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

9 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

10 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE DEBALLASTS

11 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

12 AND STARTS MOVING TO THE LOCATION

13 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

14 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

15 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

16 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

17 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

18 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

19 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method AND STARTS MOVING TO THE LOCATION

20 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE ARRIVES

21 BALLASTING

22 BALLASTING

23 BALLASTING

24 PRELAUNCH POSITION 2.5 0

25 JACKET MOVES INTO THE WATER

26 JACKET MOVES INTO THE WATER

27 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method JACKET MOVES INTO THE WATER

28 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method JACKET MOVES INTO THE WATER

29 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method JACKET MOVES INTO THE WATER

30 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TILT BEAM ROTATES UP

31 TILT BEAM ROTATES UP

32 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TILT BEAM ROTATES UP

33 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TILT BEAM ROTATES UP

34 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method

35

36

37

38

39 JACKET LAUNCHED AND LOCATED

40 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method TOPSIDE LOAD-OUT

41 DEBALLASTING

42 DEBALLASTING

43 DEBALLASTING

44 DEBALLASTING

45 DEBALLASTING

46 DEPARTURE

47 DEPARTURE

48 DEPARTURE

49 DEPARTURE

50 BARGE LOCATES IN THE JACKET STRUCTURE

51 BALLASTING

52 BALLASTING

53 BALLASTING

54 BALLASTING

55 BALLASTING

56 BALLASTING

57 BALLASTING

58 BALLASTING

59 BALLASTING

60 BARGE MOVES OUT

61 BARGE MOVES OUT

62 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

63 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

64 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

65 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

66 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

67 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

68 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

69 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

70 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

71 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

72 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

73 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

74 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

75 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method BARGE MOVES OUT

76 Heavy Lift Offshore Conference- RINA 2008 –Float Over Method PLATFORM IS LOCATED


Download ppt "Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER."

Similar presentations


Ads by Google