Console Status Erik Gottschalk. Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve.

Similar presentations


Presentation on theme: "Console Status Erik Gottschalk. Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve."— Presentation transcript:

1 Console Status Erik Gottschalk

2 Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve signal Network and VGA cables - installed PCs - purchase order for remaining 5 placed today (delivery in 1 week) Monitors - installed Video cards - 50% shipment arrives today and 50% tomorrow or Monday Projectors - one installed, purchase req. for 4 in process Server at FCC - installed and operational (hardware failure being investigated) Web server - operational Polycom V500 - used at CDF, Elliott is investigating purchase of 4 for consoles 1-East installation - ??? Telephones - cabling installed, need phones Video matrix switching - on hold until PCs are operational Mac Pro for Outreach - needs to be installed Apple TV - purchase order placed Tuesday, shipment in February Status displays - need a hardware plan for “outside” status displays VRVS PC - waiting for Windows Vista Webcam enclosure for exterior - need installation plan for Prevessin VGA2WEB devices - on hold until PCs are operational

3 12-1 4x4 Polycom 1 East ? ? VGA2WEB Each console has: 2 console PCs 1 fixed-display PC 1 Polycom V500 (??) 1 projector (1280x768) 1 VGA2WEB device

4 12-1 4x4 Polycom 1 East ? ? VGA2WEB CMS #1 CMS #2 LHC #2 LHC #1 #1 consoles - “assigned” to CMS and LHC #2 consoles - CMS and LHC have priority when requested Storefront to cafeteria

5 Proposal for LHC@FNAL Resources Resources: 4 consoles –#1 consoles, which are “assigned” to CMS and LHC, can be reserved by submitting a rudimentary 30-day (?) plan with types of activities and rough time estimates –#2 consoles, for which CMS and LHC have “priority,” can be reserved by submitting a more detailed plan that might involve making reservations (MeetingMaker) 1 conference room (1-East) –Directorate has the highest priority –Priority goes to the group (CMS or LHC) that is using the Remote Operations Center most actively, but this will still require making a reservation (MeetingMaker) –Third priority assigned to outreach activities –Room will also be available for non-LHC@FNAL users, but recurring meetings will not be scheduled.

6 Proposal for LHC@FNAL Resources CWG, LWG, and OWG should submit a 30-day plan (??) by next Thursday (Jan. 25), 5:00 pm –Approximate starting date: Feb. 1 –Rough idea of when the room will be used, and for what purpose (include dates and times, if known) To reserve 1-East (proposal!): –Email - epp@fnal.govepp@fnal.gov –Cathryn Laue - x3201 –Cindy Kennedy - x6656 CWG, LWG, and OWG should submit a list of names for people who need access to the Ops. Center, by next Thursday (Jan. 25), 5:00 pm