DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Marina Renovation Master Plan IMPLEMENTATION AND PROGRESS PRESENTATION
2
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Project Vision 2007 Vision Develop the master planning guidance for the Dillon Marina to identify the needed improvements to assure continued viability and growth of the marina facility as an important cultural asset to the Town of Dillon.
3
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
4
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 ORIGINAL GOALS RESTATED 1.Realignment of access road to the marina site and expansion of the amphitheater parking lot. 2.Use of the upper turn around circle as a mast staging area. 3.Development of a parking structure partially built into the bluff that minimizes visual disruption while providing multiple levels of protected parking. 4.Development of a multi-purpose facility integrated with the parking structure.
5
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 5.Expanded landscaping renovation and landscaping maintenance plans. 6.Alpine garden and accessible walkway connection to overlook point. 7.Renovation of Crow’s Nest facility to meet future needs. 8.Rebuilt gabion wall structures to expand storage and general use spaces on the marina site. ORIGINAL GOALS RESTATED
6
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 9.Relocated maintenance structure to better separate the public spaces from the work spaces. 10.Expanded Juniors’ facility with training bay, staging dock and improved crane yard. 11.Relocated Yacht Club. 12.Expanded and rebuilt Tiki Bar facility. ORIGINAL GOALS RESTATED
7
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 ORIGINAL GOALS RESTATED 13.New wave attenuator structure. 14.Marina docks moved to deep water and connected to shore with Wharf structure. 15.Renovated fuel dock with underground storage tanks. 16.Restroom structure on floating docks.
8
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Progress in Current Projects Shoreline stabilization project, in construction Road realignment and utility upgrades in design, on hold Parking structure at schematic level, on hold
9
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
10
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
11
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
12
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
13
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
14
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
15
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
16
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
17
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
18
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011
19
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Restarting in Progress Projects Road Realignment and Utility Upgrades Currently at design development stage Integrates with current construction Sets stage for future development
20
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Restarting in Progress Projects Parking Structure Currently at schematic design stage Integrates with road realignment project Sets stage for future development
21
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Future Projects Replacement wave attenuator Tiki Bar renovation Upland structure moves Wharf Structure and dock reconfiguration Bluff Garden and town center connection
22
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Conceptual Wharf Section