Download presentation
Presentation is loading. Please wait.
Published bySteven Allen Modified over 8 years ago
1
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST Brenda Wagner EO20 256-961-1456 Brenda.wagner@nasa.gov
2
MOL The Mission Operations Laboratory Page 2 NASA MSFC Engineering Directorate Huntsville, Alabama OpNom / Ops Overview Smartphone P/N HET-NEXUS-S-01 Smartphone Data Cable P/N HET-NEXUS-S-03 Smartphone Battery Pack P/N HET-NEXUS-S-02 Ops Overview – Initial Ops only? For how long before additional ops added? Smartphone attached to Satellite via velcro? Smartphone video activated (stays the length of the session?) Smartphone removed – cable attached to phone & SSC then video transferred to SSC. (Any special software needed to copy video from phone to SSC?) Smartphone deactivated and stowed
3
MOL The Mission Operations Laboratory Page 3 NASA MSFC Engineering Directorate Huntsville, Alabama Crew Training Added to Steve’s training in March? or OBT? or Put info in Test Plan since it is so simple??? PTDR If OBT – Send to Chris to give to Bluesuiter for review. Uplinked via OCR. If ground – get additional chart from Steve for Chris to review 2 weeks prior to March 7 th week Mike Fossum (CDR Exp 29), Don Pettit (Exp 30), and Joe Acaba (Exp 31) are in March. Ron Garan was trained back in May of last year (will he need the info?). Burbank (CDR Exp 30) will be trained in either April or May.
4
MOL The Mission Operations Laboratory Page 4 NASA MSFC Engineering Directorate Huntsville, Alabama Crew Training Data Set (TDS) If OBT will Curriculum TDS be needed? (TDS shows: OBT, any prerequisites, duration, lesson description, etc) If added to current Training – update current generic TDS? (lesson description)
5
MOL The Mission Operations Laboratory Page 5 NASA MSFC Engineering Directorate Huntsville, Alabama Product Development Milestones Template Negotiated / (grnd trng) TSTI-20 / CDRFeb 2011 OpNom Dev & SubmittalI-20 to I-16Feb 2011 Procedure DevelopmentI-20 to I-7Feb 2011 Lesson Plan/Courseware Delivery (if grnd trained) I-10May 2011 / Feb 2011 Training Verification (PTDR) (if grnd trained) I-9May 2011 / Feb 2011 Ready for Training (if grnd trained) I-6May 2011 / Mar 2011 TIR (Team Integrated Review) I-6Mar 2011 ECR to Baseline ProceduresI-6Mar 2011 Flight Rule InputsI-6Feb 2011 Payload Reg InputsI-4Feb 2011 JIT (Just-In-Time Review)I-1~4 wks minus activity
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.