Download presentation
Presentation is loading. Please wait.
Published byVivien Hoover Modified over 8 years ago
1
aais.com Building a Scheduling Team for Student Success Angela Vietti, Senior Consultant Ian J. Ross, Regional Vice President Ad Astra Information Systems
2
aais.com Agenda Scheduling Challenges Building the Schedule Strategic Scheduling Team Leveraging the Scheduling Team
3
aais.com
8
Typical Schedule Building Process Typical University Goal: Completion vs. Improvement Course ordering are based on a historical schedule, typically a roll-forward of a “like” term Departments refine offerings in silos. Distinct processes and decision makers, limited collaboration and decision- support tools SIS is updated Room assignments are made/refined “Final” schedule is posted Changes still occur after registration or even after classes start
9
aais.com
11
Two Senior Representatives from different academic units Central Scheduling/Registrar Information technology, facilities, and business office Provost/VP of Academics (periodically) Strategic Scheduling Team
12
aais.com Team Role Meets regularly Prioritizes recommendations Unified representation of the institution – Catalyst for change
13
aais.com Benchmark Strategic Scheduling CheckUp™ Faculty Allocation Analysis Analysis of Program Design (Guided Pathways) Mobilize HESI™ Dashboard (Strategic Scheduling CheckUp Update /Longitudinal Data Tracking) Registration Velocity Change Management Policy Development Optimize Astra Schedule™ Space Capacity Modeling Utilization Analysis Platinum Analytics™ Alignment of Guided Pathways and Schedule Registration Modeling Block Scheduling Nudging Students to Required Courses © AD ASTRA INFORMATION SYSTEMS™, L.L.C.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.