INSTALL INSULATION IN BOILER PLANT PROJECT 438-13-125 SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC.

Similar presentations


Presentation on theme: "INSTALL INSULATION IN BOILER PLANT PROJECT 438-13-125 SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC."— Presentation transcript:

1 INSTALL INSULATION IN BOILER PLANT PROJECT 438-13-125 SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC

2 VALVE JACKET SECTION REMOVABLE Quantity = 8 Each

3 Area 1A

4 Area 1C 6 Each – Valve Jackets to be installed

5 Area 1C

6

7 Area 1D

8 BOILER REFRACTOR JACKET SECTION REMOVABLE Quantity = 3 Each

9 Boiler Refractor Jacket 3 Each – Boiler refractor jackets to be installed

10 Removable Refractor Jacket SIGHT GLASS SHALL REMAIN OPERATIONAL

11 Refractor Jacket 12” JACKET OVERLAP ONTO BOILER TANK

12 PIPING INSULATION / PVC SECTION

13 TYPICAL SPOT WHERE PVC WRAP CAN BE INSTALLED OVER EXISTING INSULATION

14 TYPICAL AREA WHERE INSULATION NEEDS TO BE INSTALLED PRIOR TO PVC WRAP. MATCH EXISTING THICKNESS TYPICAL AREA THAT WILL NEED PVC INSTALLED OVER EXISTING INSULATION

15 TYPICAL AREA WHERE INSULATION NEEDS TO BE REPLACED PRIOR TO PVC WRAP

16

17 TYPICAL SPOT WHERE INSULATION NEEDS TO BE REPLACED PRIOR TO PVC WRAP

18 TYPICAL SPOT WHERE ONLY PVC IS REQUIRED OVER EXISTING INSULATION

19 TYPICAL BARE PIPE LOCATION WHERE INSULATION IS REQUIRED PRIOR TO PVC WRAP TYPICAL LOCATION WHERE PVC WRAP IS REQUIRED. INSULATION IS IN GOOD CONDITION TYPICAL LOCATION WHERE EXISTING INSULATION NEEDS TO BE REPLACED PRIOR TO PVC WRAP

20 TYPICAL BARE PIPE LOCATION WHERE INSULATION NEEDS TO BE INSTALLED PRIOR TO PVC WRAP TYPICAL LOCATION WHERE ONLY PVC WRAP IS REQUIRED

21 TYPICAL AREA WHERE INSULATION NEEDS TO BE REMOVED AND REPLACED WITH NEW AND THEN PVC WRAP INSTALLED

22 Area where at least 8 feet of insulation shall be replaced as it is damaged on top