1
G Bellodi - L4BCC meeting – 26/05/2011
2
26/05/2011 G Bellodi - L4BCC - meeting BE/ABP Setting requirements & specifications Coordination (G Bellodi) OP group, application programming (J-L Sanchez Alvarez) Individual equipment groups, FESA front-end software BE/CO Control systems, HW infrastructure.. (I Kozsar)
3
26/05/2011 G Bellodi - L4BCC - meeting
4
26/05/2011 G Bellodi - L4BCC - meeting E-logbook – already in use CCM/Working-sets available Alarms – LASER extension Vacuum – PVSS extension ? Radiation – RAMSES Interlocks – application, FESA classes already existing, only needs deployment (B Puccio and team, done in the past but first time Linux installation)
5
EquipmentCommentsNeeded forUse beyond 2013Status SEM grid application - 02/2011 Yes Done Spectrometer application Above+ NMR calibration, magnet cycling, plane conversion 09/2011 No (LBS?) In development Wire scanners Upgrade ISOLDE appl.09/2011 Yes In development Emittance meter application Stand-alone LabView09/2011 No In development Bunch shape monitor (Feshenko) Stand-alone09/2011YesProvided by externals Halo monitor Stand-alone09/2011No Existing, to be tested, check for maintenance BCTs Knobs, working sets and OPDisplay config 09/2011 Yes FESA scheduled for summer 2011 BPMs Knobs, working sets and OPDisplay config (orbit viewer) 09/2011 Yes FESA scheduled for summer 2011 Time of Flight In FESA 09/2011 Yes FESA scheduled for summer 2011 G Bellodi - L4BCC - meeting 26/05/2011
6
G Bellodi - L4BCC - meeting LEM screenshot x vs x’ -Separate LEM + reconstruction -Originally on different platforms & not very user- friendly (need to set a lot of parameters to launch a scan, very easy to make mistakes, BI colleagues only experts at the moment) -Work ongoing towards one single application performing scan and emittance reconstruction 26/05/2011 Evgeny’s talk
7
G Bellodi - L4BCC - meeting Current 3 MeV proton source application. Plans for more sophisticated control system being drafted for L4 H- source. 26/05/2011
8
G Bellodi - L4BCC - meeting 1.First phase of manual testing to calibrate obtained deviaton vs voltage applied (DC operation) 2. Tests of AC operation and beam time structure with halo monitor. Proposal under discussion : 1.Initially (2012) use existing BE-CO timing cards with a resolution of 25ns to provide bunch sequences for tests of basic chopper functionalities. Possibility to use RF LHC-style hardware if finer resolution (sub-ns) is required. Standard controls solution: FESA class already available. OP customisation if needed. 2.End 2012: LLRF development at 352MHz. Commissioning time slot should be planned for testing simple beam sequences at 3 MeV in the tunnel, as starting point for a full LLRF validation and more complex tests of L4 synchronisation to the PSB and beam production schemes. FESA classes provided by RF. Simple application needed to define bunch sequences to be tested. Ideally identify a person in OP to take charge and follow up all LLRF-related work in view of developing the final “Linac4 Super-application”(?). 26/05/2011
9
G Bellodi - L4BCC - meeting OASIS: initially not foreseen, request has since been approved for a package to have availability of signals from transformers, pick-ups and power supplies Ioan’s talk 26/05/2011
10
G Bellodi - L4BCC - meeting
11
26/05/2011 G Bellodi - L4BCC - meeting Component, measurement systemparametersunits Power suppliesU(t), I(t), U eff, I eff V, kV, A, mA Sparks counterI>I peak min -1 H 2 injection and Pumping systems (extraction, Einzel lens, LEBT) P(t), P max, P eff mbar H 2 density regulation (density, thickness) (t), eff, X eff At/cm 2 Residual gas mass analysis spectrum and follow up of H, H 2, N, N 2, O, O 2, OH, H 2 O, CO 2, CO, Ar Mass spectrum, I(M,t) At/s Optical emission spectroscopy: spectrum and H , H , H relevant impurities I(200-900 nm) Hi(t), Hi eff Photon/s Timing and delaysto i, dt i ms, s TemperaturesTiTi °C°C RFf, U F (t), U R (t) Vacuum gauges, valves Interlocks & safety systems Time dependent values will be acquired via oscilloscopes: 2 OASIS systems x 16channels (8x10MHz bandwidth, 8x100MHz bandwidth ) J Lettry Ex. date=03/2013 at the latest
12
26/05/2011 G Bellodi - L4BCC - meeting -control/status for H- foil exchanger - viewing SW and control for foil camera (could be like BTV application). -dedicated BLMs synoptic -data logging - what, with what frequency, what filtering etc. -dump current monitoring (normalisation to the injected beam intensity to judge if the foil is degrading). -display of beam intensity in the line, intensity circulating, transmission/injection efficiency values Ex. date=2014
13
26/05/2011 G Bellodi - L4BCC - meeting High level applications to control chopper/pre-chopper sequences and synchronisation timings in PPM mode according to super-cycle specifications Setting up of users in the super-cycle : intensity per beam, number of PSB rings for injection, number of turns per ring. From these settings the correct chopper and pre-chopper sequences are selected. Synchronization of the beam delivered by Linac4 with the PSB RF system LLRF system compensation of beam loading transients by feed-forward Energy modulation for longitudinal painting if needed External conditions (suppressing injection into one or more rings) and interlocks internally accounted for. Complex tool but to be kept of as simple use as possible Ex. date=2014
14
26/05/2011 G Bellodi - L4BCC - meeting
15
26/05/2011 G Bellodi - L4BCC - meeting
16
3 MeV test stand : o Progress is ongoing and details/requests are being defined for software and hardware needs. o Coordination meetings are held ~every couple of weeks, with more specific meetings in between. Present status, progress tracking, deliverables ) Linac4 Longer term planning (considering both development and maintenance needs): -availability of resources - impact from LS1 activities - expected showstoppers? 26/05/2011