Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS +1-443-430-8089 skype:

Similar presentations


Presentation on theme: "Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS +1-443-430-8089 skype:"— Presentation transcript:

1 Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS howard.weiss@parsons.com +1-443-430-8089 skype: hsweiss

2

3 Meeting Agenda 15 April 2013 – 08:30 – 09:30: CCSDS Plenary – 09:30 – 12:30: Systems Engineering Area (SEA) Plenary – 13:30 – 18:30: Security WG – Welcome, introductions, logistics, agenda review – Review results of Fall 2012 (Cleveland) meeting – Status of documents, action items – Charter review (updated per Cleveland mtg) – Algorithm Yellow Book Status and Testing – DLR testing complete & documented (Richter) – Any other testing plans? – Algorithm Green Book Review (Weiss)

4 Meeting Agenda (cont) 16 April 2013 (08:30 – 18:30) – Key Management Blue Book (Fischer/Aguilar-Sanchez) » KM for SDLS extended procedures – Threat book re-write (Black/Weiss/Biggerstaff) – Network Layer Security Discussion (Weiss) » Adaptation profile outline » Testing agencies – Link Layer Security Update (Biggerstaff/Weiss/Aguilar-Sanchez) – Physical Layer Security (Aguilar-Sanchez) » Advanced Coding research – Joint security meeting with DTN Working Group – Other areas of discussion – Proposed new areas of work 17 April 2013 – 08:30-18:30: Space Data Link Security WG 18 April 2013 – 08:30-12:30: Space Data Link Security WG – 13:30-18:00: SEA Wrap-up Plenary

5 Attendance NameOrganizationEmail Address Howard Weiss (Chair)NASA/JPL/PARSONShoward.weiss@parsons.com Gordon BlackUK Space Agency/Logicagordon.black@logica.com Daniel FischerESA/ESOCdaniel.fischer@esa.int Martin PilgramDLRmartin.pilgram@dlr.de Julio ViveroGMVjvivero@gmv.com Ignacio Aguilar-SanchezESA/ESTECignacio.Aguilar.Sanchez@esa.int Lei ZhangBITTTzhanglei@bittt.cn Dorothea RichterDLRdorothea.richter@dlr.de Julian AiraudCNESJulien.airaud@cnes.fr Roberto GarelloPolitecnico di Torinogarello@polito.it

6 Executive Summary  Attendees from UK Space Agency, ESA/ESTEC, ESA/ESOC, DLR, CNES, GMC, BITTT, and NASA/JPL. Due to sequestration budget issues NASA Johnson, Goddard, and Glenn representatives were unable to travel.  Reviewed charter updates approved by CESG after Cleveland meeting. Also reviewed projects framework and updated the Algorithms Green Book and Key Management Blue Book schedules.  Reviewed action items – all except for three were completed.  Reviewed “management remarks on Security WG” with Martin Pilgram. Provided updated language regarding Security WG strategic plan.  Algorithm Yellow Book: No other Agencies have any plans for additional Algorithms testing.  Reviewed draft of Algorithm Green Book. Very few changes.  Reviewed status of Network Layer Security: adaption profile discussions with Tom Gannett. Request for additional testing to GRC.  Reviewed the KM Blue Book progress and the integration with the SDLS extended procedures directions.  Discussed ESA-sponsored advanced coding research program: AJ.  Discussed directions for Threat Green Book revision.  Held joint meeting with DTN WG to discuss DTN security.  SDLS: revisions to Red-3, extended procedures, SLP.

7 Summary of Goals and Deliverables 1. Provided SecWG “strategic goal” wording. 2. Draft of Algorithm Green Book reviewed: document almost complete. 3. KM Blue Book for symmetric KM making good progress. Since it is abstract, we’ve discussed making this a Magenta Book. 4. Discussed revisions to the Threat Green Book. 5. Discussed direction for network layer security “adaptation” profile. Investigate how IPsec could be used over non-IP protocols. Need additional agencies to volunteer for testing in addition to NASA/GRC. 6. Reviewed SDLS progress in SecWG 7. Joint meeting with DTN WG for DTN security. 8. ESA research on advanced coding techniques to avoid jamming.

8 SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.Security WG Goal: Working Status: Active _X_ Idle ____ Summary progress: documents actively being produced: Key Management BB, Algorithms GB, Threat GB revision, Network Layer BB. All docs green. Progress since last meeting: algorithm YB done, algorithm GB almost complete. Other books progressing. Problems and Issues: Resources – Lose of NASA resources is a major issue. status:OKCAUTIONPROBLEM Comment: Working Group is advancing and producing good products. Docs OK.

9 Near-Term Schedule DeliverableMilestoneDate Program Framework Update CWE04/13 Key Management Blue Book Continue drafting next revision08/13 Network Layer Profile Outline of document06/13 Threat Document Revision First revised draft09/13 Intermediate telecon Document status check06/13 Algorithm Green Book Revise, final update, submit to secretariat. 05/13

10 Near-Term Schedule (cont) Common Criteria Protection Profiles FutureTBD Application Layer Security FutureTBD SW Defined Radio Security FutureTBD Physical Layer Security (Channel Coding) FutureTBD

11 Open Issues  Deciding which new areas to work on.  Discussions in SecWG regarding IOAG, CMC, CESG direction/requirements.  Currently SecWG has done “speculative” development.  Should it be requirements driven?

12 Action Items Item NumberAction Item:Assigned to:Date Due: SecWG0413:1Update Algorithm GBHoward Weiss05/31/13 SecWG0413:2Update project framework dates & information Howard Weiss04/22/13 SecWG0413:3Investigate if IPsec can be run over non-IP protocols. Howard Weiss06/01/13 SecWG0413:4Discuss changing Key Management BB to Key Management MB with Area Director. Howard Weiss04/22/13 SecWG0413:5Review existing list of Threat GB threats for additions, deletions, expansion, etc. All08/30/13 SecWG0413:6Set up an interim teleconHoward Weiss06/15/13

13 Resource Problems  Resources had been adequate to perform the current tasks although personnel have only limited time percentage to apply to CCSDS tasks. Recent loss of NASA personnel will hurt unless they can be restored to attend meetings.

14 Risk Management Update  Must ensure that the current trend of additional resources remains and that resources don’t shrink. UK Space Agency has only provided miniscule resources so that they cannot be effective.

15 Cross Area WG / BOF Issues  Joint meeting with Space Data Link Security WG  Joint meeting with DTN WG  Continued interaction with Spacecraft Monitoring & Control although no joint meeting in Bordeaux.

16 Resolutions to be Sent to CESG and Then to CMC  None.

17 New Working Items, New BOFs, etc.  None.