EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE
2
Keywords Cable-less. Electrically actuated. Variable lift gas rate. Remote monitoring and control. Wireline/Slickline-less.
3
EGLV’s Field Trial at S181 - Background Installed in Dec’ 2002 with 2 pods. Bottom pod failed in Apr’ 2003. Top pod remain operational. operational. Reason of failure – communication modem. Workover completed in Jul’ 2003. 3 pods were installed. installed.
4
Gas Lift Optimization Cycle - Conventional Takes 2 to 4 months (resource-dependent) to realize optimization opportunities if wireline entry is involved Gather Data - FTS - Well tests - others Gas Lift Redesign - Optimum Injection Depth - Optimum Lift Gas Rate Wireline entry Surface GL control - optimize set point Q vs. I CalibrateWinGLUEmodel
5
EGLV ‘s Graphical User Interface - Wonderware TRENDING – PARAMETERS vs.TIME EGLV - UNLOADING EGLV - ORIFICE EGLV CONTROL
6
S181 – Successfully unloaded using Wonderware Tubing press at unloading depth (POD 2) Tubing press at orifice depth (POD 1) Annulus press at orifice depth (POD 1) % valve open at orifice depth (POD 1)
7
S181 – Gas lift optimization Gas lift flow Tubing press at orifice depth (POD 1) Tubing press at unloading depth (POD 2) Gas Lift has no benefit
8
S181 – Gas Lift Optimization EGLV uses FBHP vs. gaslift rate instead of Oil Rate vs. gaslift rate % open/gaslift rate FBHP % open/gaslift rate OIL RATE
9
Gas Lift Optimization Cycle - EGLV Gather Data - FTS - Well tests - others Gas Lift Redesign - Optimum Injection Depth - Optimum Lift Gas Rate Wireline entry EGLV control - optimize % valve open Q vs. I CalibrateWinGLUEmodel Near instantaneous optimization of a gas lifted well !!
10
Other implications to the gas-lift operator Multi-point injection may be a thing of the past. Injection pressure is utilized to the maximum. A wide range of lift gas rate is at the operator’s disposal. High well deviation is not a factor in spacing of mandrels.
11
In the pipeline Refine GUI to facilitate monitoring and optimization Develop a control algorithm to optimize a EGLV well automatically (synergy with the Production Universe team). automatically (synergy with the Production Universe team).
12
BACK-UP SLIDES
13
How does an EGLV work ? Electro-magnetic principle Bi-directional Communication up/down casing Using gas filled annulus for electrical isolation P/T based on strain gauges VMonitor link to office VMonitor S-181 ~ 2 upper pods with "unloading valve" lower pod with "variable orifice" electrical choke
14
EGLV completion equipment
16
S181 Well Schematic