Presentation is loading. Please wait.

Presentation is loading. Please wait.

Similar presentations


Presentation on theme: ""— Presentation transcript:

1 http://www.assetpoint.com/products-eam-preventive-maintenance-software-module.htm

2 What is Preventive Maintenance (PM)? “Preventive maintenance (PM) has the following meanings: The care and servicing by personnel for the purpose of maintaining equipment and facilities in satisfactory operating condition by providing for systematic inspection, detection, and correction of incipient failures either before they occur or before they develop into major defects. Maintenance, including tests, measurements, adjustments, and parts replacement, performed specifically to prevent faults from occurring. The primary goal of maintenance is to avoid or mitigate the consequences of failure of equipment. This may be by preventing the failure before it actually occurs which Planned Maintenance and Condition Based Maintenance help to achieve. It is designed to preserve and restore equipment reliability by replacing worn components before they actually fail. Preventive maintenance activities include partial or complete overhauls at specified periods, oil changes, lubrication and so on. In addition, workers can record equipment deterioration so they know to replace or repair worn parts before they cause system failure. The ideal preventive maintenance program would prevent all equipment failure before it occurs.” (Wikipedia. Preventive Maintenance. http://en.wikipedia.org/wiki/Preventive_maintenance) http://en.wikipedia.org/wiki/Preventive_maintenance

3 Preventive Maintenance Software – TabWare by AssetPoint For years, AssetPoint has been helping companies from all scales and industries to achieve effective and optimal asset management. TabWare, one of the leading EAM CMMS software in the market, serves well as preventive maintenance software in addition to other asset management features. It is a single platform which helps to easily plan, organize and manage all PM works including building PM Master Plans, linking them to equipment and scheduling PM work order generation. In overall, the TabWare PM provides a comprehensive audit trail of all PM work and reports schedule compliance.

4 Key Features of TabWare Preventive Maintenance Software PM Master Plans are pre-planned work orders stored in TabWare. Every change to equipment operating status stops/starts PM work, with 52-week look ahead for insights of resource requirements and necessary adjustments.

5 Key Features of TabWare Preventive Maintenance Software PM Master Plans are pre-planned work orders stored in TabWare. Every change to equipment operating status stops/starts PM work, with 52-week look ahead for insights of resource requirements and necessary adjustments. Link a single PM Master Plan to multiple equipment items, and link a single equipment item to multiple PM Master Plans

6 Key Features of TabWare Preventive Maintenance Software PM Master Plans are pre-planned work orders stored in TabWare. Every change to equipment operating status stops/starts PM work, with 52-week look ahead for insights of resource requirements and necessary adjustments. Link a single PM Master Plan to multiple equipment items, and link a single equipment item to multiple PM Master Plans Schedule PM work orders by time and/or units. Also provides automatic PM roll-up for daily, weekly, monthly, quarterly and annual PMs

7 Key Features of TabWare Preventive Maintenance Software PM Master Plans are pre-planned work orders stored in TabWare. Every change to equipment operating status stops/starts PM work, with 52-week look ahead for insights of resource requirements and necessary adjustments. Link a single PM Master Plan to multiple equipment items, and link a single equipment item to multiple PM Master Plans Schedule PM work orders by time and/or units. Also provides automatic PM roll-up for daily, weekly, monthly, quarterly and annual PMs Hold generation of a new PM pending completion of an existing PM

8 Key Features of TabWare Preventive Maintenance Software PM Master Plans are pre-planned work orders stored in TabWare. Every change to equipment operating status stops/starts PM work, with 52-week look ahead for insights of resource requirements and necessary adjustments. Link a single PM Master Plan to multiple equipment items, and link a single equipment item to multiple PM Master Plans Schedule PM work orders by time and/or units. Also provides automatic PM roll-up for daily, weekly, monthly, quarterly and annual PMs Hold generation of a new PM pending completion of an existing PM Schedule compliance reported on KPI dashboards

9 TabWare by AssetPoint Visit http://www.assetpoint.com/products-eam-preventive-maintenance-software-module.htm for further information on TabWare Preventive Maintenance Software.http://www.assetpoint.com/products-eam-preventive-maintenance-software-module.htm

10 Contact AssetPoint www.assetpoint.com 770 Pelham Road Greenville, SC 29615 Tel: 864.679.3500


Download ppt ""

Similar presentations


Ads by Google