Download presentation
Presentation is loading. Please wait.
Published byKerry Young Modified over 8 years ago
1
Four Mile Run Restoration Pre-Bid Meeting April 25, 2016
2
Grant Requirements EPA State and Tribal Assistance Grants - construction contract requirements Affirmative action – 28% minority and women – need to send notice to EPA on contract award Goals for Disadvantaged Business Enterprise participation If not able to meet DBE goals, provide documentation of efforts made with your bid DBE reporting form due annually to EPA Disadvantaged Business Enterprise (DBE) Vendor Search http://www.dmbe.virginia.gov/cgi-bin/dbe_search.cgi
3
Pre-Qualifications Three prior projects completed in last 10 years Minimum construction Value of $500,000 Provide ALL required information for project to be considered
4
Safety Working in/near water Slopes Uneven ground Fluctuating water levels Overhead Lines Park Safety Pedestrians Cyclists
5
Project Scope Bank Naturalization Rip rap removal Grading Planting Geocell Retaining Walls (6 walls, approximately 864 linear feet) Living Shorelines (9, approximately ¼ mile in length, 0.57 acres) Observation Platform Trail Renovation
6
Permits and Regulations Arlington County Acquiring permits, including: Transportation ROW Building Permit USACE Nationwide General Permit DEQ Construction Permit LDA Permit Erosion and Sediment Control Stormwater Pollution Prevention Plan
7
MOT and Access Four Mile Run Trail Trail will be closed with the LOD Exception is the portion between S. Eads and Rt 1- only closed during active work in that section South Eads Access through Water Pollution Control Plant S. Glebe Rd Access
8
Four Mile Run Restoration Pre-Bid Meeting April 25, 2016
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.