Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 KENYA SPAIN MULTILATERAL PARTNERSHIP MEETING (08-11 December 2013) AfDB Kenya Water and Sanitation Portfolio.

Similar presentations


Presentation on theme: "1 KENYA SPAIN MULTILATERAL PARTNERSHIP MEETING (08-11 December 2013) AfDB Kenya Water and Sanitation Portfolio."— Presentation transcript:

1 1 KENYA SPAIN MULTILATERAL PARTNERSHIP MEETING (08-11 December 2013) AfDB Kenya Water and Sanitation Portfolio

2 2 Two questions Which are the Banks interventions in the Water and Sanitation Sector in Kenya? What is the status of these projects and are there any issues? AfDB Current portfolio

3 3 Project name Loan (UA Millions) Grant (UA Millions) Total (UA Millions) Water Services Boards Support Project 35.1910.0745.26 Small towns and rural water supply and sanitation project 70- Nairobi rivers sewerage improvement project 35- Thwake Multi purpose water development project 61.6801.21162.89 313.15

4 4 AfDB Current portfolio Water Services Boards Support Project Loan –35.19 million UA ( 3.7 Billion KES) Grant – 10.07 million UA (1.2 Billion KES) Signed: 26.11.2007; Effective: 12.03.2009; Closing: 30.06.2014 Overall disbursement:62% Executing Agencies; LVSWSB,TWSB,NWSB,AWSB Project Components include; Institutional Development Support, Urban Water Supply and Sanitation; Rural Water Supply and Sanitation and Kibera Development Support.

5 AfDB Current portfolio STATUS AS AT 30.11.2013 5 UrbanRural Physical Implementation of works75% 70% Overall Disbursement62%65% Pending procurementsNone

6 6 AfDB Current portfolio Small Towns and Rural Water Supply and Sanitation Project Loan – 70.00 million UA ( 8.7 Billion KES) Signed: 31.03.2010; Effective: 21.01.2011; Closing: 30.12.2014 Overall disbursement: 25% Executing Agencies; LVSWSB,TWSB,TAWSB, Project Components include; Institutional Development Support, Water Supply and waste water infrastructure; Water storage interventions including Yatta Dam.

7 AfDB Current portfolio Performance as at 30.11.2013 7 Water supply and wastewater infrastructure Physical Implementation of works Awarded construction contracts are at 50% Disbursement25% Pending procurements Rehabilitation of Yatta Canal Construction of Yatta Dam

8 AfDB Current portfolio 8 NAIROBI RIVERS REHABILITATION AND RESTORATION PROGRAM: SEWERAGE IMPROVEMENT PROJECT Loan – 35.00 million UA ( 4.4 Billion KES) Signed: 01.03.2011; Effective: 22.02.2012; Closing: 30.12.2015 Overall disbursement:25% Executing Agency; AWSB Project Components include; (a) Institutional Development Support, (b) Wastewater Infrastructure – covering rehabilitation and expansion of the Sewerage network and treatment, and c) Sanitation, Hygiene and Social Environmental Support

9 AfDB Current portfolio Performance as at 30.11.2013 9 Waste water infrastructure Physical Implementation40% Disbursement25% Pending procurementsNone

10 10 AfDB Current portfolio Thwake Multi Purpose Water Development Project Loan –61.68 million UA ( 8 Billion KES) Grant – 1.21 million UA (157Million KES) Approved 30.10.2013 Signed: Not Yet; Closing: 31.12.2019 Overall disbursement: 0% Executing Agency; MEW&NR Project Components include; Thwake Multi-purpose dam with 681 million m 3 of storage construction, Environmental & Social Support ; Program Management & Capacity Building Support.

11 AfDB Current portfolio Performance as at 30.11.2013 11 Multi purpose water infrastructure Physical Implementation of works- Disbursement0% Pending procurements Construction of Thwake Dam Design and supervision consultancy. Various consultancy services

12 AfDB Current portfolio 12 KEY ISSUES AND CHALLENGES Long duration in fulfilling effectiveness conditions by borrower (6-12 months). Long duration in (i) procuring consultants and (ii) preparation of designs and bidding documents ( avg of 12 months for each activity) Quality of Contractors/consultants Tax Exemptions ( 2- 3 months) Delays by both Implementing Agencies and AfDB Project Implementation Design involving many IA’s with different capacities. Resettlement is a lengthy process especially where there are disputes on land ownership. Conflicts where water resources are being transmitted from a different county.