Download presentation
Presentation is loading. Please wait.
Published byStanley Peters Modified over 8 years ago
1
1 Willamette Valley Intermodal Facility: Feasibility Study
2
Current Situation Business Drivers Loss of Hanjin @ T6 Long drop-off queues Evolving federal trucking rules Metro highway congestion Economic Consequences Oregon is a an economic disadvantage with rising shipping costs—both time and money. 2
3
Trade & Logistics Initiative T & L Initiative o Strategic Investments in Freight Logistics to Sustain Services o New Intermodal Rail Yard Feasibility Study in the Mid- Willamette Valley: 3 Governors Transportation Visioning Panel GTVP: Aviation, Marine and Freight Rail o Reduce highway congestion and increase freight rail efficiency by investing in ‘mode shift’ where market opportunities exist: o Invest in multimodal freight facilities including transloading facilities and port drop sites o Preservation and enhancement of shortline rail for corridors that serve ports
4
Example Location: “A Day’s Drive” 4
5
Next Steps and Discussion 5 Next Steps: o Business Oregon received funding ($100K) for study thru SB 5701 o Business Oregon, ODOT, ODA and RS meeting to discuss how best to initiate study effort o Complete study prior to 2017 session Discussion and Feedback
6
THANK YOU Chris Cummings (503) 986-0158 Chris.Cummings@Oregon.gov http://www.orinfrastructure.org
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.