Download presentation
Presentation is loading. Please wait.
Published byThomasina Lloyd Modified over 8 years ago
1
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR
2
12/13 Nov 2003 Cryo Harness2 Test Cryo Harness Cryostat internal (FPU to FTH): ready, integrated and tested. Only 128 Pin FTHs were used; cable lengths comparable to PFM Harness Additional Test Optics Harness also ready Cryostat external (FTH to BOLC + DECMEC): under CEA and CSL responsibility; to be delivered with AVM WEU of BOLC and DECMEC; cable lengths comparable to PFM Harness; Aluminium Braid as over shield Test for complete Harness planned No separate SVM Harness built
3
PACS IHDR12/13 Nov 2003 Cryo Harness3 AVM ILT CVV Internal Harness
4
PACS IHDR12/13 Nov 2003 Cryo Harness4 FTH Strained Relief
5
PACS IHDR12/13 Nov 2003 Cryo Harness5 MDM Strained Relief
6
PACS IHDR12/13 Nov 2003 Cryo Harness6 PACS-MA-SP-001, Iss. 3.2 is the relevant specification document. All CR (0028, 0032) are agreed and accepted. Manufacture status is under Astrium responsibility: CDR at CASA in CW 47/03, Prod. already started Routing on CVV, bundling and pinning were checked and agreed EQM harness for EQM ILT is longer than PFM harness (~ 15 cm) Maximum cable shield pigtail lengths are not yet clarified. IID-A, 3draft2, §5.14.2.9. Defines max. unshielded length of max. 8 cm at connectors. Acceptable, if it is on both sides of the connector.
7
PACS IHDR12/13 Nov 2003 Cryo Harness7 PACS CVV External Cryo Harness Design Courtesy of Astrium
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.