Download presentation
Presentation is loading. Please wait.
Published byPatricia Butler Modified over 8 years ago
1
Bob Edwards Oregon Dept. of Fish and Wildlife
2
Is there an existing structure? What is the integrity of the structure? Is the location of the structure adequate? Will it be cost effective short term and long term?
3
Big Creek 40 CFS Flat Panel, Single Wiper
7
Crooked River 8 CFS Hydrolox Belt Screen
8
Water user has very limited funding available Concrete is already in place Site is in a great location in the canal
11
Over budget Performance Issues Maintenance Issues Was it worth it?
12
City of Seaside Municipal diversion. 8cfs Site dates back to the 1930’s. S. Fk. Necanicum River 8cfs Municipal Diversion $171,360.00 Can we make this one work?
19
Short Term Benefits vs Long Term Benefits Cost Savings vs Cost Over-runs Location
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.