Download presentation
Presentation is loading. Please wait.
Published byLeonard Powers Modified over 8 years ago
1
Airport Noise Compatibility Study Group Navigation Committee Noise Abatement Strategies: The Critical Questions Which runway use provides the most noise reduction north of the airport? east preference (current) west preference no preference day/night split Which runway use provides the most noise reduction south of the airport? mixed divergence off west runway (current) all diverge no divergence (except simultaneous ops) resolve Fort Knox restricted area issue How can we minimize exceptions to contraflow operations, thus minimize sleep disturbance? options operations affected/cost benefits How can we improve the consistency and predictability of runway use direction? education/knowledge base too hard for model
2
Airport Noise Compatibility Study Group Navigation Committee Noise Abatement Strategies: The Critical Questions Which turning rules give the “best” results? noise exposure consistency/predictability alone/with standard prescribed tracks What prescribed tracks give the best noise reduction, while remaining operationally sound? for arrivals for departures with/without exceptions for visual handoff/gateway points What navigation aids or standards can be applied to minimize deviation from prescribed tracks? required navigational performance (RNP) specific hardware/procedures for emerging technology, knowledge base What other operational procedures can be added to reduce noise exposure? costs benefits What other facilities, use restrictions, regulations, and management measures can be applied to enhance the program?
3
Airport Noise Compatibility Study Group Navigation Committee Noise Abatement Strategies: Bear Traps Imprecision “daytime contraflow” “I-65 corridor” “straight-out departure track” Premature Closure advanced technology contraflow exceptions runway use criteria net assessment Terminology “preference/preferential use” “peak/non-peak” “voluntary measure” Meaningful progress depends on our ability to avoid these traps. If we don’t, we get stuck.
4
Airport Noise Compatibility Study Group Navigation Committee Noise Abatement Strategies: Imperatives Precise definition of each strategy measures included measures excluded rationale follow-up documentation Close - intimate - communication on analysis Study Group checks inputs emerging insights relayed right away anomalies identified for further study course corrections when appropriate Open-ended review of results think before packaging challenge assumptions, conclusions ongoing feedback Results of this phase crucial to study results. “Oops” no longer affordable.
5
Airport Noise Compatibility Study Group Navigation Committee Noise Abatement Strategies recommended to the Study Group Common elements minimize contraflow exceptions noise-optimal prescribed tracks (STARs, SIDs) with minimal exceptions RNP or hardware specs to minimize deviation operational measures (potential excursions) facilities, use restrictions, regulations, management measures document knowledge of ‘emerging’ measures Principal alternatives Limit east runway preference to daytime only; southbound divergence according to destination Eliminate runway preference; all southbound diverge on 17R Reverse runway preference; no divergence on 17R, except simultaneous operations Key conditions: Ft Knox issue resolved favorably Results for each major lobe of noise contours
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.