David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.

Similar presentations


Presentation on theme: "David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1."— Presentation transcript:

1 David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1

2 2

3 Stacy Boulevard Bulkhead Improvement Project Existing Conditions 3

4 4

5 Stacy Boulevard Bulkhead Improvement Project Proposed Work 5 Work Involves: Pre-construction coordination, Excavation Removal of the existing stone bulkhead in sections, Installation of a new reinforced concrete footing, Reconstruction of the mortared stone bulkhead utilizing existing and supplemental stones, Installation of filter fabric with drainage system, Backfilling, Reconstruction of the existing stone revetment, Stairway reconstruction and repairs, Resetting of existing or supplemental granite capstones, Installation of new railings and concrete sidewalk, Restoration of landward park features including upgrades to lighting, irrigation, sod, benches and miscellaneous park features.

6 Stacy Boulevard Bulkhead Improvement Project Proposed Work 6

7 Blynman Canal Bulkhead Improvement Project 7

8 Blynman Canal Bulkhead Improvement Project Existing Conditions 8

9 Blynman Canal Bulkhead Improvement Project Proposed Work 9 Work Involves: Pre-construction coordination, Install reinforcing, Install waterside steel sheet cofferdam, Concrete fill between sheeting wall and bulkhead, Wall joint repairs, Excavate/remove upper portion of bulkhead, Install landside steel sheetpile cofferdam, Reconstruction of the upper stone bulkhead, Construct perpendicular wall, Reconstruction of the existing bulkhead with concrete footing, concrete bulkhead with stone veneer, Filter fabric/drainage, Remove and reconstruct upper portion of bulkhead STA. 1+50 to 2+00, Restoration of landward park features.

10 Blynman Canal Bulkhead Reconstruction Project 2002 Work – South Side 10

11 11 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects Questions