Presentation is loading. Please wait.

Presentation is loading. Please wait.

ACP / WGN / SGN1 #7 th meeting March 2006 Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris.

Similar presentations


Presentation on theme: "ACP / WGN / SGN1 #7 th meeting March 2006 Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris."— Presentation transcript:

1 ACP / WGN / SGN1 #7 th meeting March 2006 Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris Doukas DAS/CSM ACP/WGN/SG1 7 th Meeting 27 March 2006, Malmo

2 ACP / WGN / SGN1 #7 th meeting March 2006 Surveillance Data Distribution Requirements Forum Activities Implementation Examples  RMCDE  Multicast Content

3 ACP / WGN / SGN1 #7 th meeting March 2006 SDDRF: Migration of Surveillance Data Exchange from X25 to IP IP-SDE Working Team established under the SDDRF Documents under preparation:  Functional Requirements  Security Requirements  Safety Requirements  QoS Requirements  Communication Interface Specifications (e.g. Protocols)  Implementation Planning

4 ACP / WGN / SGN1 #7 th meeting March 2006 Target: have all documents finalised in Q3 2006 Finalised Requirements will be submitted for approval to the EUROCONTROL Surveillance & Communication Teams SDDRF: Drafting of Detailed Requirements

5 ACP / WGN / SGN1 #7 th meeting March 2006 Surveillance data distribution over IPv4 for WAN communication has been implemented Validation tests have been planned in phases  Between RMCDEs only (in a mixed environment X25/IP)  Between RMCDEs with the use of a minimum underlying network infrastructure (IP routers, X25 switches)  Between RMCDEs with the use of actual network infrastructure (RAPNET) and IP routers  Between different environments (not only RMCDE) IP Implementation in RMCDE

6 ACP / WGN / SGN1 #7 th meeting March 2006 First two phases done successfully Test programme planned to be completed Q4 2006 IPv6 planned for implementation in 2008 IP Implementation in the RMCDE

7 ACP / WGN / SGN1 #7 th meeting March 2006 IPv4 operational (at national level - Spain) IPv6 planned for 2007/8 International Multicast: 2010+ (PENS) Multicast data distribution

8 ACP / WGN / SGN1 #7 th meeting March 2006 More information Contact: Dimitris DOUKAS Email: dimitris.doukas@eurocontrol.intdimitris.doukas@eurocontrol.int Telephone:+32 2 729 3460


Download ppt "ACP / WGN / SGN1 #7 th meeting March 2006 Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris."

Similar presentations


Ads by Google