Download presentation
Presentation is loading. Please wait.
Published byJosephine McDaniel Modified over 8 years ago
1
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 1 Other R&D Harold G. Kirk Brookhaven National Lab
2
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 2 Post-MERIT Targetry effort Hg Handling Issues –Continuous Hg Loop –Eurosol/ESS Collaboration Hg Jet optimization –Nozzle optimization –Reconfigured Optical Diagnostics –Improved Jet delivery Jet/Beam Dump Interaction –Jet/Dump Splash Studies Iron Plug Studies Tungsten-Carbide Shielding
3
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 3 Hg Handling Issues Engineer Hg loop Study CW Hg flow issues Acquire Hg safety experience Explore collaboration with Eurosol/ESS
4
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 4 Iron Plug Purpose: Generate a more uniform magnetic field in jet delivery region More closely approximate NF/MC targetry concept Reduce jet distortion Nozzle/Jet Integration Mechanical forces and stress analysis essential
5
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 5 Beam Dump in Main Cryostat Assembly and maintenance issues require further thought Thermal management issues will be significant Simulation and hardware studies of Jet/dump splashes
6
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 6 Tungsten-Carbide Shielding Shielding Rudimentary Concept: Needs further developing
7
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 7 DELIVERABLES Nozzle design for optimized Hg jet delivery Understanding of Jet/Dump interaction issues Operational experience with a continuous Hg loop Demonstration of impact of Fe plug on jet performance Design for a water-cooled Tungsten-Carbide shield
8
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 8 Promising R&D Approaches Parametric Ionization Cooling (PIC) –FNAL A0 Acceleration of Intense Bunches –VEPP-4 (Novosibirsk) Ionization Cooling Ring –Proton FFAG Osaka High Gradient Induction Acceleration –Dielectric Wall Acclerator-LLNL Liquid Li Lens
9
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 9 PIC Beam Dynamic Studies at A0
10
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August 2008 10 COST BREAKDOWN FY08FY09FY10FY11FY12 FTEs1.42.74.65.96.6 SWF (K$)310387686856927 M&S (K$)115175356491493 Total (K$)425562104213471420
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.