1 SVT 4/5 operation CDF meeting 1/16/2003 G. Punzi for the SVT group

2 SVT had a test run after Christmas with 4/5 operation and standard physics table (155818+) –Uses all 5 SVXII layers allowing 1 miss –Standard mode (4/4): require 4 hits on a fixed set of 4 layers Separate test of 3/3 (recover 3-layer wedges) (155918) Expect efficiency improvement and less need for SVT config changes with changing SVX conditions. 4/5 mode is part of the SVT design, yet took lots of hard software work to implement: patterns, simulation, download code…(Roberto, Bill, Jahred...)

3 Impact on trigger timing SVT execution time increase 7µs –due to increased number of candidate track fits (compatible with expectations) –limited impact on overall L2: ~40µs  ~47µs (+17%) No significant effect with the current L1 rate limitation –but we are looking at ways to control this anyway Optimize patterns Cut on strip noise

4 Impact on trigger rates

5 Resolution Resolution uniform between combinations - slightly worse when L0 is missing 3-layers: larger I.P. tails: 28% vs 17% (small number of wedges) (µm)

6 Efficiency Expect track efficiency improvement ~1.4 for the 2/3 of wedges with 5 active layers  ~1.25 overall Measurements of track eff. and S/B underway Eff. Gain (for tracks with 4 good hits) Patt. Coverage (4-comb.) (  / a 4 )[ [1-(1-a 5 ) 5 ]+5(1-  )a 5 ]

7 D 0 yield x 1.7±0.1 (L3 tracks) (Roberto) 4/4 4/5 379 nb -1 471 nb -1

8 D 0 yield x1.46±0.01 (full reco) (Stefano) = 1.55

9 Plans Analyze “SVT calibration” run taken last week (being produced) Study&optimize: 4/5 has even more free parameters than 4/4 - try to get maximum benefit with minimal side effects. Further L3 rate reduction by Si tracking will be important (Marco,Rolf : ~x2 reduction) Look forward to starting up with a new improved hadronic trigger after the shutdown