Presentation is loading. Please wait.

Presentation is loading. Please wait.

E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.

Similar presentations


Presentation on theme: "E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered."— Presentation transcript:

1 E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered to CERN –Working place (including tables, and SM bandage) was prepared –PMT setup calibration –Mechanical design of fixation and layout of splitters and drivers boards was checked with real SM –Monitoring boards were installed on PS Inner (cryo) SM Now: –3 outer SMs are also equipped with boards –The first tuning of LED signals is done on SPD outer SM (preliminary is OK!) – Is being tested now and soon: Electrical layout (electrical screening of cables, grounding) Final tuning for various LED (we have tree types) Mechanical layout of cables for inner part

2 E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN Monitoring boards installation Total installed: –11 splitters and 80 drivers on inner SM – 3*( 26 drivers + 3 splitters) on outer SMs

3 E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN Inner SM layout

4 E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN Tuning of LED pulses First tuning is done on SPD outer SM. LED signal is set ~ 5mV on 50 Om (@HT=850V)

5 E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN Tuning of LEDs


Download ppt "E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered."

Similar presentations


Ads by Google