Download presentation
Presentation is loading. Please wait.
Published byRodney Tyler Modified over 8 years ago
1
THE BAIKAL NEUTRINO EXPERIMENT: STATUS, SELECTED PHYSICS RESULTS, AND PERSPECTIVES Vladimir Aynutdinov, INR RAS, Moscow for the Baikal Collaboration for the Baikal Collaboration VLVnT08 22-24 April 2008
2
Collaboration Institute for Nuclear Research, Moscow, Russia. Irkutsk State University, Russia. Skobeltsyn Institute of Nuclear Physics MSU, Moscow, Russia. DESY-Zeuthen, Zeuthen, Germany. Joint Institute for Nuclear Research, Dubna, Russia. Nizhny Novgorod State Technical University, Russia. St.Petersburg State Marine University, Russia. Kurchatov Institute, Moscow, Russia.
3
Baikal Outline: Introduction Neutrino telescope NT200 (1998 - 2003) Design and Physics Results (selected) Future Gigaton-Volume (km3-scale) detector BAIKAL-GVD Preliminary Design NT200 upgrade NT200+ (2005 - 2006) Prototype string for BAIKAL-GVD detector (April 2008) Summary
4
Baikal - History Since 1980 Site tests and early R&D started 1989/90 Proposal NT200 detector in lake Baikal submitted NT361993 NT36 started 13.4.93 (36 PMTs at 3 strings) The First Underwater Array First Neutrino Candidates NT200 commissioned 06.04.981998 NT200 commissioned 06.04.98 Start full Physics program NT200+ commissioned 09.04.052005 NT200+ commissioned 09.04.05 2006/7 R&D for Gigaton (km3-scale) Volume Detector (GVD) 2008 April 2008 - prototype string for GVD was installed2008 April 2008 - prototype string for GVD was installed
5
The Site 4 cables x 4km to shore. 1070m depth 3600 m 1366 m NT-200 Absorption length: ~25m Scattering length: 30-60 m Detection volume >> geometrical volume
6
Ice stable for 6-8 weeks/year: –Maintenance & upgrades –Test & installation of new equipment Winches used for deployment
7
-8 strings: 192 optical modules 96 measuring channels T, Q measure *Timing ~ 1 nsec *Dyn. Range ~ 10 3 ph.e. Effective area: 1 TeV~2000m² Eff. shower volume: 10TeV~ 0.2Mt Quasar : d = 37cm Height x = 70m x 40m, V inst =10 5 m 3
8
Low energy phenomena (muons) - Atmospheric neutrinos High energy phenomena (cascades) Diffuse neutrino flux - Diffuse neutrino flux - Neutrinos from GRB - Prompt muons and neutrinos Search for exotic particles - Magnetic monopoles - WIMP Selected Results
9
Atmospheric Muon-Neutrinos Skyplot of NT200 neutrino events for 5 years (galactic coordinates) 372 Neutrinos in 1038 Days (1998-2003) 385 events from Monte-Carlo E THR 15-20 GeV
10
( Lake Baikal (NT200) & South Pole (Amanda) Complete sky coverage including central parts of Galaxy Lake Baikal South Pole Skyplot of neutrino events Atmospheric Muon-Neutrinos
11
+ b + b C + + no osc. osc. upward going muons Angular distribution of upward going muons as well as background expectation (502 days) Limits on the excess muon flux from the center of the Earth as a function of WIMP mass Search of nearly vertically upward going muons, exceeding the flux of atmospheric neutrinos WIMP Search 24 ev.
12
Search for fast monopoles N = n 2 (g/e) 2 N =8300 N (g = 137/2, n = 1.33) ~E =10 7 GeV Event selection criteria: 1.Hit channel multiplicity N hi t > 35 ch 2. Upward-going monopole (z i -z)(t i -t)/( t z ) > 0.45 & o Background - atmospheric muons Limit on a flux of relativistic monopoles: < 4.6 10 -17 cm -2 sec -1 sr -1 90% C.L. upper limit on the flux of fast monopole (994 livedays) Amanda II (preliminary)
13
NT200 large effective volume NT200 is used to watch the volume below for cascades. („BG“) Search for extraterrestrial high energy neutrinos Look for upward moving light fronts. Signal: isolated cascades from neutrino interactions Background : Bremsshowers from h.e. downward muons
14
Experimental limits + bounds/ predictions Diffuse Neutrino Flux Limits + Models NT200 (1038 days) no statistically significant excess above the background from atmospheric muons has been observed The 90% C.L. “all flavour” limit (1038 days) for a =2 spectrum Ф ~ E -2 (20 TeV < E < 50 PeV), and assuming e : : = 1 1 1 at Earth ( 1 2 0 at source ) E 2 Ф <8.1·10 -7 GeV cm -2 s -1 sr -1 (Baikal 2006)
15
Searching for diffuse neutrinos based on cascades reconstruction Energy distribution of experimental (1999), as well as generated and reconstructed events from atmospheric muons Cascade reconstruction: lgE ~ 10%; r ~ (5-10)%; o Selection conditions: E>100 TeV, N hit >18 Cut E>100 TeV old cut Hit channel multiplicity Expected limit (1038 days) for E -2 spectrum: E -2 ~ 4 ·10 -7 GeV cm -2 s -1 sr -1 (twice lower than old one)
16
Ultimate goal of Baikal Neutrino Project: Gigaton (km3) Volume Detector in Lake Baikal Sparse instrumentation: 91 – 100 strings with 12 – 16 OMs (1300 – 1700 OMs) - effective volume for >100 TeV cascades: ~ 0.5 -1.0 km³ lg E) ~ 0.1, med < 5 o - detects muons with energy > 10 - 30TeV 624 m 280m 70m 120m 208m
17
NT200+ (2005) 36 additional PMTs on 3 far ‘strings‘ 4 times better sensitivity Improve cascade reconstruction Vgeom ~ 4 ·10 6 m 3 Eff. shower volume: 10 4 TeV ~ 10 Mton Expected -sensitivity (3 yrs NT200+) E 2 Ф V < 2 · 10 -7 GeV cm -2 s -1 sr -1 Basic building block of Gigaton Volume Detector - Height = 210m - = 200m - = 200m - Volume ~ 5 Mton NT200+ = NT200 + 3 outer strings
18
Calibration and time synchronisation with laser 100m X2 X1 X3 100m Laser is visible >200m with high Ampl. (NT200 and Ext.strings) Laser intensity : cascade energy: (10 12 – 5 10 13 ) : (10 – 500) PeV NT200+ time resolution
19
NT200+ efficiency of cascade reconstruction Laser coordinates reconstruction NT200 NT200+ 3 extern. str. r < 1 m (E cascades 10 PeV)
20
Prototype string km3-scale BAIKAL telescope NT200+ current status Prototype string Installation of a “new technology” prototype string as a part of NT200+ (8 April 2008) Investigations and in-situ tests of basic elements of km3 detector: optical modules, DAQ system, new cable communications. Studies of basic DAQ/Triggering approach for the km3-detector. Confrontation of classical TDC/ADC approach with FADC readout.
21
Design of Prototype string FADC data are transmitted through an Ethernet line to PC unit String PC connected through DSL-modem to central NT200+ control unit Control of OM and LED flasher through RS-485 underwater bus (coax. cable) 60 m 8-ch 12-bit 200 MHz FADC unit Trigger: - 1…4-fold OM coin. - outer NT200+ trig. OM power supply control Ethernet data line OM signal & power – 1 coax. cable PMT: XP1807 (Photonis, 12”), R8055 (Hamamatsu 13”) HV : PHV12-2.0K DC-DC conv. VIP-2A (Irkutsk) DC-DC OM controller: - microcontroller C8051F124 - RS-485 interface - PM pulse counter - HV control & monitor - 2-LED calibration
22
Basic parameters of prototype string prototype string Number of optical modules: 6 Number of spectrometrical channels: 8 Type of PMT: XP1807 (12”), R8055 (13”) Dynamic range: high gain chan. 0.2 … ~100 p.e (*) low gain chan. 0.5 … ~300 p.e. Time window: 5 mks Time resolution: < 5 ns (*) – range of spectrometrical channel linearity
23
String control center: LED flasher FADC unit PC unit
24
Optical module installation: UP-looking OM DOWN-looking OM
25
Prototype string in-situ tests (LED flasher) Time shift estimation with LED flasher: time difference between neighbored OMs OM#1 OM#2 OM#3 OM#4 OM#5 OM#6 3 2 1 4 6 5 ~20 m coax cable ~20 m A, V Example of LED flasher event PRELIMINARY ~20 m coax cable ~20 m
26
Prototype string in-situ tests (Laser event) OM#1 OM#2 OM#3 OM#4 OM#5 OM#6 50 m LASER Example of laser event with time shift correction 2 1 3 6 5 4 PRELIMINARY
27
Prototype string in-situ tests (muon event) Example of down-going muon event Trigger: 3-fold coincidence OM#1 OM#2 OM#3 OM#4 OM#5 OM#6 2 1 3 6 5 4 PRELIMINARY ?
28
CONCLUSION 1. BAIKAL lake experiment is 1. BAIKAL lake experiment is successfully running since 1993 - The First Underwater Array - First Neutrino Candidates - Some HE neutrino production models already ruled out by the experiments 2. NEW configuration NT200+ starts work at April 2005 and is successfully operating now. - Improved cascade reconstruction - NT200+ gives good possibilities to optimise the design and to investigate the key elements of future Gton scale detector 3. Start R&D for Gigaton Volume (km3-scale) Detector (BAIKAL-GVD) - A “new technology” prototype string was installed: 6 OMs with 12”/13” - Preliminary in-situ tests of the prototype string with underwater laser, LED flasher and muons shows good performance of all string elements.
29
END
30
Cable communications Time synchronization with NT200+: 2 coaxial cable, Request & Acknowledgment Connection to shore: DSL 2-wire line, 1 Mbit OM slow control: RS-485 bus on the basis of coaxial cable FADC and PC unit connection: Ethernet on the basis 2 coaxial cables OM signal & power supply: individual coaxial cable to each module Time calibration with LED flasher: individual optical fiber to each module
31
OM#2, low gain channel Examples of laser events for 5 laser intensities I1I2 I3 I4I5 OM#1 OM#2 OM#3 OM#4 OM#5 OM#6 50 m LASER Prototype string in-situ tests Laser RUN: events rate vs. time. 5 laser intensities: I1, I2,…,I5. I i /I i+1 ~ 2.5…3 PRELIMINARY
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.