Presentation is loading. Please wait.

Presentation is loading. Please wait.

NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.

Similar presentations


Presentation on theme: "NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change."— Presentation transcript:

1 NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change Research Center Vietnam Future activities of Wind Power NAMA in Vietnam

2 Future activities – Activity 1.7. Plan for MRV System Measurement, Reporting, and Verification (MRV): Measurement: either by monitoring, for example, the amount of fuels that have been saved through NAMA, or calculation using the available data; Reporting: a result of climate change mitigation impact that has been measured in the form of ton of CO2e per year (t-CO2e/year) reduced by NAMA, is compiled and reported. Verification: the result obtained through measurement is checked and confirmed whether all the information and data contained in a report is accurate and correct. It is advised not to establish a new monitoring system for the proposed NAMA, but to use the existing monitoring and reporting system available for CDM projects.

3 Future activities (cont’) – Activity 1.8. Identification of Institutions and Responsibilities: The NAMA coordinator should clearly define the roles of all actors involved in the NAMA conception phase, including: Involved entities; Roles and responsibilities of involved entities; Definition of expertise required (technical or institutional). – Activity 1.9. Stakeholder Engagement: Stakeholder engagement should play a decisive role throughout the process of wind NAMA development. Stakeholders would be more strongly involved in the early stages of preparing a NAMA when crucial issues require the stakeholders´ attention. Stakeholders should be kept informed when the NAMA is being implemented.

4 Future activities (cont’) – Activity 1.10. Identifying support options: Develop a mechanism for applying low-interest loans from mitigation funds; Develop a mechanism for apply government guarantee; – Activity 1.11. Involvement of Donors NAMA finance from: Public domestic sources International donors. – Activity 1.12. Finalization of the Wind NAMA concept note: The wind NAMA concept should be finalized and approved before submitting to the UNFCCC.

5 Future activities (cont’) Phase 2: Apply supporting policies and measures for a pilot project in Vietnam (August 2014 - December 2016) : – Phase 2 will consist of two components, including (i) capacity building for local partners, and (ii) the implementation of a pilot project in Vietnam. – An application for low-interest loan to mitigation funds would be made for the selected project. – A propose for a government guarantee would be made for the selected project.

6 Future activities (cont’) Phase 3: Full development of the NAMA program (January 2017 – December 2020) : Phase 3 will consist in the full implementation of the NAMA throughout cities in Vietnam. In phase 3, the role of state renewable energy agencies in the project will be enhanced so as to apply supporting policies and measures for wind energy in the whole country. On this stage, the MOIT will play a vital role in the project, with the technical assistance from DMHCC and UNEP, which will be involved in the Consultation Board to MOIT. By the end of phase 3, the project is expected to lead to a significant reduction of GHG emissions from energy sector in order to achieve the target of reducing GHG emissions by 8% from energy and transportation by 2020, in line with Decision No. 1775/QD-Ttg. – Applications for low-interest loan to mitigation funds would be made for approved wind power projects. – Propose for government guarantee would be made for approved wind power projects.

7 3. Work plan (cont’) Phase 1 – Preparation and Scoping (August 2013 – August 2014) (cont’): Activity2014 JanFebMarAprMay Jun e JulyAug 7. Plan for MRV system 8. Institutions and responsibility 9. Stakeholder engagement 10. Identifying support options 11. Involving donors 12. Finalizing the wind NAMA concept

8 3. Work plan (cont’) Phase 2 –Implementation of a pilot project in Vietnam (September 2014 - December 2016): OutputActivities Coordinat or Key stakeholdersYear 1Year 2 Output: implementation of wind power pilot project Activities 1.1: Review on the investment report, investment project and the electricity development planning of the city/province DMHCC, MOIT Department of Industry and Trade, the provincial People’s Committee and EVN x Activities 1.2: Select the location DMHCC, MOIT Department of Industry and Trade, the provincial People’s Committee x Activities 1.3: Select the approved wind power projects which are suitable to the objective of NAMA proposal (capacity, location) DMHCC, MOIT The People’s Committee, the Department of Planning and Investment, and the Department of Industry and Trade x Activities 1.4: Apply a low-interest loan and government guarantee to assist the construction of the selected project DMHCC, MOIT The project owner, Mitigation funds, The People’s Committee, Ministry of Finance xx

9 Thank you for your attention!!!


Download ppt "NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change."

Similar presentations


Ads by Google