Download presentation
Presentation is loading. Please wait.
Published byLeona Elliott Modified over 8 years ago
1
Current Status of the Project C. Loomis CNRS/LAL The StratusLab project is co-funded by the European Community’s Seventh Framework Programme (Capacities) Grant Agreement INSFO-RI-261552
2
2 Administrative Points Collaboration Agreement Signed by all partners, in force since end of July 2010 All partners should have received countersigned signature pages Full copies can be requested from Guillaume Bénard Grant Agreement After long delay, resolved IBBA issue between CNRS and EC EC countersigned Grant Agreement 25 August 2010 Pre-financing CNRS ready to distribute pre-financing to partners with Form A and Bank Info. Waiting funds transfer from EC Optimistically, partners should have money by end of September Partne r Form ABank Info. CNRSNAOK UCMOKMissing GRNE T OK SixSqOK TIDScanned TCDMissing
3
3 Technical Points Sprints Completed Sprints 0, 1, and 2 (see JIRA, indico) Currently in Sprint 3, result will be content of first StratusLab release Sprint 4: likely to be clean-up, documentation, packaging Attendance at EGI-TF 5 people attending (CNRS, GRNET, TCD, UCM) 3 specific StratusLab presentations, additional OpenNebula talks Demo Preparations for EGI-TF Will have booth at EGI-TF, manned by StratusLab attendees Open question about projector/screen Preparation of posters/flyers next week Will need quick turnaround on comments for that material
4
4 Deliverables & Milestones Current Status Suggested Deliverable/Milestone Policy Draft for review available no later than end of month. Comments from TSCG, participants, (ext.) reviewers within 1 week Final version available 1 week later Sent to EC within 15 days of the end of the month DocumentStatus D2.1 (PM2): User/Admin SurveySubmitted (13 Aug. 2010) D4.1 (PM3): ArchitectureDraft for comments D5.1 (PM3): Infrastructure Spec.In preparation MS1 (PM3): Mgt. Infra. And Metrics Draft for review MS6 (PM3): WebsiteDraft for review QR1 (PM3)Waiting input from Activity Mgrs.
5
5 Points for Discussion Partner Participation Generally good, worry about visibility of TID, UCM Hiring Issues Need to ensure manpower is available for work plan Tighten Up Procedures More rigorous testing, continuous integration procedures Regular meetings of TSCG, more involvement in Sprint definitions Interactions between OpenNebula and StratusLab Ensure consistent message between the two projects Ensure close collaboration to avoid divergence of software Deliverable/Milestone Procedure (on agenda) Intellectual Property Decisions (on agenda)
6
6 Deliverable/Milestone Policy Suggested Deliverable/Milestone Policy Draft for review available no later than end of month. Comments from TSCG, participants, (ext.) reviewers within 1 week Final version available 1 week later Sent to EC within 15 days of the end of the month External Reviewers Leave external reviewers to discretion of activity managers Frank Harris willing to work informally with us with these
7
7 Deliverables/Milestones Propose common (all partners) copyright statement Copyright © 2010, Members of the StratusLab collaboration: Centre Nationale de la Recherche Scientifique, Universidad Complutense de Madrid, Greek Research and Technology Network S.A., SixSq Sàrl, Telefónica Investigación y Desarrollo SA, and The Provost Fellows and Scholars of the College of the Holy and Undivided Trinity of Queen Elizabeth Near Dublin. Acknowledgement of EC funding on all documents “StratusLab is co-funded by the European Community’s Seventh Framework Programme (Capacities) Grant Agreement INSFO-RI- 261552.” Propose release under CC BY (attribution) license Requires attribution, allows commercial/non-commercial reuse http://creativecommons.org/licenses/by/3.0/ http://creativecommons.org/licenses/by/3.0/
8
8 Presentations Propose to treat presentations like Deliverables/Milestones Acknowledgement of EC funding Common copyright CC BY license
9
9 Code Copyrights Propose that only partner creating file appears in copyright statement Propose also acknowledgement of StratusLab before copyright –“Created as part of the StratusLab project (http://stratuslab.eu)” Each file needs to contain copyright and license statement License Partner decides what license to use Should be strong preference for Apache2 to allow coherent StratusLab distribution If not Apache2 or compatible, need evaluation of how code will fit into StratusLab distribution without contaminating other code before development starts
10
10 Scientific Papers Acknowledgement “The authors gratefully acknowledge the financial support provided by the European Commission to the StratusLab project (http://stratuslab.eu), Grant Agreement INSFO-RI-261552.”http://stratuslab.eu “Open Document” Requirement Scientific papers can only be submitted to journals that accept the “Open Document” requirement from the EC Journal editors should be warned of this requirement when papers are submitted. Authors must post the final document in an appropriate repository
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.