Download presentation
Presentation is loading. Please wait.
Published byVincent Manning Modified over 8 years ago
1
Institutionalization of HDM-4 Procedures and Systems Henry Kerali Lead Transport Specialist The World Bank
2
Vision and Aims for HDM-4 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is: –sustainable, affordable, appropriate Implementation should achieve: –Independence from external support –System is mainstreamed into regular road management practice
3
Users & Customers Policy level –Economic Development/Planning Departments; Finance/Treasury/Budget Ministries; IFIs; Dir-General Highways/Infra; Road Fund Board; Transport Planning & Road Management Units Network planning –Director-Gen, Road Board Exec Director, Dept. Treasury/Budget; Dir. Planning, Regional Operations Dir., Road or Pavement Mgt Unit, Road Authority Program Div. Project level –Dir. Planning, Dir. Technical/Design, Feasibility Unit, RMU-PMU-PIU
4
DataCollection Database DecisionSupport ManagementInformation Inventory Condition Structures Traffic Furniture Unit Costs Standards RDBMS (RIMS) Life Cycle Analysis (HDM-4) Standard & Custom Reports Road Management Systems
5
Decision Support System Important to have transparency of analysis Life cycle analysis capable of: –Short, Medium & Long term analyses –What-if analysis, Performance indicators Management must understand analysis framework Availability of local technical expertise Default data sets HDM-4
6
Implementation Options New RMS built around HDM-4 Interface existing RMS or database with HDM-4 Incorporate parts of HDM-4 into local RMS or generic RMS (usually VOC, RDWE) Modify local RMS from HDM-4 knowledge base, e.g. improving predictive relationships, adding economic calculations
7
System Architecture Prefer open architecture; –Several applications operating under common platform with shared data –Can substitute and update applications easily Incorporate HDM-4 through an interface; ensure on-going international support and updates Custom-built systems; cecome outdated rapidly and are expensive to upgrade
8
Procurement Options Dedicated department In-source expertise Out-source monitoring surveys Out-source analysis and program drafting
9
Risks & Constraints Interruption to establishment, slow adaptation (reassignment, leadership change, etc.) Slow or lacking updating of IT or HDM software Perception of complexity, reliability, or local validity
10
Communication & Messages Report high-level information on future projections to stimulate interest and champions Use Performance Indicators like: –Impacts of varying budget levels –return on projects and programs Visits to/from countries with successful implementation
11
Closing Remarks Tailor outputs and messages to key audiences Keep data and reporting practical, affordable and reliable – choose appropriate level of data detail (Information Quality Level) Incorporate into enterprise IT architecture Mainstream analyses and surveys into regular road management processes Utilize international user support opportunities
12
Discussions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.