L04 Workshop #2 Phoenix, AZ February 27, 2015. Desired Outcomes Analysis Framework Plan Working Outline  Leverage Data Collection Plan & Stakeholder.

Similar presentations


Presentation on theme: "L04 Workshop #2 Phoenix, AZ February 27, 2015. Desired Outcomes Analysis Framework Plan Working Outline  Leverage Data Collection Plan & Stakeholder."— Presentation transcript:

1 L04 Workshop #2 Phoenix, AZ February 27, 2015

2 Desired Outcomes Analysis Framework Plan Working Outline  Leverage Data Collection Plan & Stakeholder Feedback  Plan grows into report  Scenario manager inputs to outputs linked to…  DynusT  AMS Data Hub Proof-Of-Concept Pilot Test Plan Outline  Apply analysis framework

3 Steps Test Scenario Manager ability to create fixed and random scenarios with weather and crashes (KAI, MAG, Metro)  Validate reasonableness of scenario outputs Test and validate connection to DynusT from Scenario Manager (Metropia) Test and validate connection from DynusT to NeXTA “Trajectory Processor” (Xuesong, Anxi)

4 Steps Based on testing results, refine proof-of-concept test plan  Hours/duration of simulation  # of days  Iteration approach  Mix of incidents, weather, work zones  Geographic area (freeways only?) Calibration Precision/Accuracy  Fall within 5 th /95 th “band”

5 2010 vs. 2013 – Portland PORTAL