INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA
2
MECHANICAL ENCLOSURE STATUS UPDATE Aluminum enclosure assembled Aluminum enclosure assembled Hinges, fans, fan screen attached Hinges, fans, fan screen attached Scatter shield cut and assembled Scatter shield cut and assembled AC voltage monitor, emergency stop and LCD screen mounted AC voltage monitor, emergency stop and LCD screen mounted Scatter shield hinge/lock holes drilled Scatter shield hinge/lock holes drilled Phase 5 plans: Attach locks and scatter shield Attach locks and scatter shield Mounting of testing boards Mounting of testing boards Accessories (grommets, rubber feet, u channels, etc) Accessories (grommets, rubber feet, u channels, etc)
3
LOAD BOARD – CONSTANT CURRENT - CURRENT REMAINS CONSTANT OVER WIDE RANGE OF LOAD VOLTAGES PWM ValueCurrent (mA)Voltage 1550.850 1550.2100 1550.7150 1550.5200 1550.1250 1550.5300 1550.8350
4
LOAD BOARD – CONSTANT CURRENT -CURRENT STAYS CONSTANT AFTER DISABLING THEN RE-ENABLING THE CONTROLLER BOARD PWM ValueCurrent (mA)Voltage 2065.450 2065.450 2065.450 2065.450 2065.450
5
LOAD BOARD – CONSTANT CURRENT -CURRENT STAYS CONSTANT AFTER RECOMPILING AND RERUNNING CODE PWM ValueCurrent (mA)Voltage 1550.950 1551.050 1551.050
6
LOAD BOARD – CONSTANT CURRENT -CURRENT STAYS CONSTANT AFTER RECOMPILING AND RERUNNING CODE VoltageCurrent (mA)Voltage 1.0168.350 1.0165.0100 1.0166.7150 1.0181.3200 1.0168.7250 1.0194.2300
7
RELAY BOARD AND AUTOTRANSFORMERS Relay Board is complete Relay Board is complete Using jumper wire to bypass 2 connectors for ease of testing, will incorporate in final testing. Using jumper wire to bypass 2 connectors for ease of testing, will incorporate in final testing. Autotransformers tested and wired up properly. Ready for use in final test phase. Autotransformers tested and wired up properly. Ready for use in final test phase. Note: 264 VAC transformer actually outputting 275 at no load. Safe to assume this will lower when load is applied? Note: 264 VAC transformer actually outputting 275 at no load. Safe to assume this will lower when load is applied?
8
CONTROLLER BOARD TESTING Electrical testing complete Electrical testing complete Wire harnesses partially assembled Wire harnesses partially assembled Software testing to begin this weekend Software testing to begin this weekend Need to get Bear Supply (12V 36W) Need to get Bear Supply (12V 36W)
9
SOFTWARE PROGRESS Debug mode ready for hardware testing Debug mode ready for hardware testing Great debugging tool: Visual Studio w/ Arduino extension Great debugging tool: Visual Studio w/ Arduino extension Unlike regular Arduino IDE, breakpoints CAN be set and executed while running the Arduino board Unlike regular Arduino IDE, breakpoints CAN be set and executed while running the Arduino board Easily watch variables Easily watch variables Most error codes done Most error codes done About half of them are working About half of them are working LCD display working LCD display working
10
DEBUGGING MODE Software code is separated into sections and now can be individually disabled/enabled, including: Software code is separated into sections and now can be individually disabled/enabled, including: Procedures Procedures Loops Loops Individual functions Individual functions Other features including an option to print messages to Serial instead of printing to LCD Other features including an option to print messages to Serial instead of printing to LCD
11
ERROR CODES Vincent defined termination point error messages Vincent defined termination point error messages TERMINATED AT: TERMINATED AT: SETUP SETUP CONTROLLER CALIBRATION CONTROLLER CALIBRATION POWER SUPPLY TEST POWER SUPPLY TEST CONTROLLER TEST CONTROLLER TEST ASSEMBLED UNIT TEST ASSEMBLED UNIT TEST PROCEDURE NOT FOUND PROCEDURE NOT FOUND Error Reasons defined as well ERROR: 24 V NOT FUNCTIONAL NO VOLTAGE AT OUTPUT CALIBRATION DATA DOES NOT MATCH OUTPUT VOLTAGE NOT WITHIN 10% OF 55 V AT NO LOAD OUTPUT VOLTAGE NOT WITHIN 10% OF 55 V AT FULL LOAD HIGH VOLTAGE AND CURRENT OUTPUT NOT WITHIN TOLERANCE 24 VOLTAGE OUTPUT WITH NO LOAD NOT WITHIN TOLERANCE 24 VOLTAGE OUTPUT WITH FULL LOAD NOT WITHINT TOLERANCE ERROR OR NO REPLY FROM CONTROLLER NO SD CARD INSERTED SD CARD UNREADBLE INVALID BARCODE SCAN FAILED – RESCAN NO RECORD EXISTS RTC FAILURE ENCLOSURE OVERHEATED CLOSE LID FOR TEST WARNING WARNING EMERGENCY STOP
12
RS-232 TESTING Tested Converter Tested Converter Connected to terminal Connected to terminal Receiving & sending commands Receiving & sending commands PLANNED TO PERFORM ITEMS BELOW PLANNED TO PERFORM ITEMS BELOW Sent simple commands to controller board Sent simple commands to controller board Unlock code Unlock code Voltage & current settings Voltage & current settings Enable & disable commands Enable & disable commands Ensured commands are measuring correct output Ensured commands are measuring correct output
13
IMAGINE RIT PROGRESS Poster Progress Poster Progress Reformatted and cleaned up Reformatted and cleaned up Waiting on finished product picture and testing results to finish – 80% done Waiting on finished product picture and testing results to finish – 80% done Paper Progress Paper Progress Paper about 80% complete Paper about 80% complete Results Results Conclusion Conclusion
14
PROBLEM TRACKING
15
REST OF THE SEMESTER…