Download presentation
Presentation is loading. Please wait.
Published byDiana Sanders Modified over 8 years ago
1
HISER project 3rd GA meeting 18-19 Feb 2016 - Orleans
2
Agenda Thursday, Feb 18Friday, Feb 19 8:30 Reception and welcome Review of the agenda and project timeline WP1 – Coordination and management WP2 – Tools for highly effective demolition WP3 – Technological solutions – presentations 8:30 8:45 WP1 - Review of contractual clauses, reporting and payments 9:15 WP7 – Innovation and exploitation 9:30 WP8 – Communication and dissemination + WP6 – Policies and standards 10:30 BREAK 10:45 WP4 – Case studies 11:45 WP5 – LCA and LCCA 13:00 Questions, comments and closure Lunch 14:00 TOUR: BRGM Facilities WP3 – Technological solutions – discussion 17:15
3
Project calendar Starting date: Project duration: Finishing date: February 1, 2015 48 monthsJanuary 31, 2019 Orleans BRGM Lyon LAFARGE 26-27-28 October 1 st reporting period (m1-m18) 1 st review meeting
4
Deliverables D2.1 Report on technical and non-technical gaps in current practices in SD of buildings (m8 m13) D5.1 Methodological report of integrated environmental and economic assessment (m8) D7.1 Market analysis report 1 (m10 m13) D2.2 Smart BIM-SD Tool specification (m11 m13) D2.3 BIM-SD & Materials DB Data models (m14) D2.4 BIM-SD objects generator guideline (m15) D5.2 Material flow analysis (m18) D2.5 BIM wereable editor (m19) WP3 Tech prototypes & D3.6 Intermediate Circular Economy for stony, gypsum, wood and mineral wool (m20) D2.6 BIM-SD analyser (m21)
5
Communications with the PO Amendments Amendment 1 VTT Change of personnel costs from actual personnel costs to average personnel costs. Amendment (Reference Nº AMD-642085-9) launched in Jun, submitted in Aug, approved in Dec Amendment 2 (pending) INASH Change of beneficiary due to partial takeover Last June 24 th, Inashco R&D was split by its owners into two companies, one of them called ADR Technology and the other called Inashco R&D. All activities of the original Inashco R&D concerning the recycling of concrete were assigned to ADR Technology. All rights and obligations regarding the HISER Agreement has been transferred to ADR Technology B.V. Ethics requirements have been associated with new deliverables (D9.x). HISER Conference, proposed and to be organised by TUD. Budget Changes in Annex I
6
Advisory Board OVAM Eurogypsum AENOR Michel Baars EDA (signature pending) EnviroCentre (invited)
7
Advisory Board Additional members? European aggregates association, ERMCO, CEMBUREAU Proposed by Luxinnovation (National Agency for Innovation and Research) Progroup is a consulting & engineering company very much engaged in achieving the circular economy transition in the construction sector. ProGroup plans to build new constructions based on CE principles in the city of Wiltz, future Luxembourgish hotspot for the circular economy. The interest of Progroup in the Hiser project would be to learn from the project but also to share their own experience with the members of the consortium. Progroup The Luxembourg Institute for Science and Technology is also very much interested in the project. LIST has competences in the field of Life Cycle Analysis but also materials and they are a key actor advising the Ministry of Economy to support the National strategy towards a circular economy.Luxembourg Institute for Science and TechnologyLife Cycle Analysis materials Advisory Board
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.