PRE-BID MEETING CONSTRUCTION OF MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING INSURANCE PRESENTATION Presented by: Dennis Govender 13 November 2014
2
Pricing & Insurance Pricing required on two mandatory alternatives: 1.Total price including insurances – Employer to provide no insurances; Contractor provides insurances Price With Insurance (PWI) 2.Total price excluding Employer arranged insurances – Employer to provide selected project insurances Price Without Insurance (PWOI) 2016/07/022
3
Insurance Costing 2016/07/023 Price with (PWI price) and without insurance (PWOI price) as per the requirements set out in the Price Schedules Bids will be evaluated including insurance (PWI price) Employer may choose either option i.e. with insurance (PWI price) or without (PWOI price) If the Employer chooses the (PWOI) option; the insurances provided will be as per insurance policies included in the enquiry documents
4
Costing – with Insurance (PWI) 2016/07/024 Refer to ITB 17.5(a) & ITB 17.5 (c)&(d) ITB 35.4(a) & ITB 39 Quote for CIP and other insurances as listed in GC 33, GC 34 and Appendix 3. Insurance Requirements Cargo Insurance Installation All Risks Third Party Liability Insurance Automobile Liability Insurance Workers’ Compensation Employer’s Liability Other Insurances NB: list type & cost per type
5
Costing Excluding Employer Arranged Insurances (PWOI) 2016/07/025 For Employer arranged insurances refer Insurance Schedule (Appendix 9): Master Policy for Construction and/or Erection All Risks (Installation All Risks) and Public Liability Insurance (Third Party Liability Insurance) SASRIA Limited Coupon Policy for Special Risks Insurance for Contract Works (Riot) Marine Policy (Cargo Insurance) If Employer arranges listed insurances GC 33 & GC 34 will be replaced by PC 33 & PC 34