GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.

Similar presentations


Presentation on theme: "GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream."— Presentation transcript:

1 GOODWIN CREEK @ WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream and riparian corridor functions

2 Goodwin Creek @ McBride Property Design Layout for Bends 1 & 2 Tieback/key- 1.0 ton/ft LPSTP- 0.5 ton/ft LPSTP- 1.0 ton/ft KEY Traffic Control Stones Bendway Weirs 1.0 ton/ft Boil-Up Pool 2.0 tons/ft Bend 1 Bend 2 FLOW

3 DESIGN CHOSEN BY THE LANDOWNER FOR BEND #1: LPSTP WITH BENDWAY WEIRS & MAXIMUM VEGETATION. BANK ALMOST COMPLETELY BUILT OUT INTO STREAM (UPPER BANK SLIGHTLY LAID BACK AT EDGE)

4 Project designers Dr. Andrew Simon ARS-NSL & Dave Derrick, ERDC-CHL GOODWIN CREEK–CONSTRUCTION-FEB 2007–DIRK SPENCER

5 THE PLAN Actually Derrick’s cheat sheet PIX BY DANNY KLIMETZ

6 Pix with outline of proposed work FILL CUT LPSTP Typical post-project cross-section

7 Goodwin Creek-Cross Section-Soil Cut/Fill Area (Bend 1) NOTE: All cut/fill activity will be in balance KEY LPSTP Fill area ELE +0.0 +12 +15 Varies 7 to 14 ft Cut areas This left bank cut area will also provide a floodplain bench for the stream 6 ft LPSTP Top bank, right descending bank

8 PRE-PROJECT CONDITIONS BEND #1

9 Looking DS at Bend #1 GOODWIN CREEK - NOV 2007 - PIX BY DERRICK

10 From channel, looking DS @ Bend #1 GOODWIN CREEK - NOV 2007 - PIX BY DERRICK

11 FLOOD APRIL 6, 2005 BEND #1

12 Looking DS at supercritical flume-good hydro data GOODWIN CREEK – FLOOD APR 6, 2005

13 Looking DS @ Bend #1 Note thalweg trace GOODWIN CREEK – FLOOD APR 6, 2005

14 LET’S GET IT STARTED

15 1 of 7 trucks stuck GOODWIN CREEK – CONSTRUCTION - FEB 2007 –DANNY KLIMETZ

16 Dave Derrick teaching some of the 44 workshop participants GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

17 ALL METHODS USED IN PROJECT LPSTP WITH TIEBACKS & KEYS LIVE STAKING OF ADVENTITIOUS ROOTING SPECIES (Willow, River Birch, & Sycamore) LIVE SILTATION TRANSPLANTATION OF BOTH TRIMMED & WHOLE TREES RPM ROOTED STOCK (3 GALLON CONTAINER) PLANTS LIVING RETARDS & LIVING DIKES POLE PLANTING & UPPER BANK CURTAINS BENDWAY WEIRS TRAFFIC CONTROL STONES BOIL-UP POOL AN ENGINEERED ROCKED RIFFLE SEEDING & MULCHING

18 CONSTRUCTION BEND # 1

19 Bend 1 Tieback/key- 1.0 ton/ft LPSTP- 0.5 ton/ft LPSTP- 1.0 ton/ft KEY Bendway Weirs 1.0 ton/ft Traffic Control Stones Flow Top bank

20 SELF-ADJUSTING, SELF-FILTERING STONE Undercut & launched, original height of protection is reduced Original cross-section, note angle of repose 1:1.5 to 1:1.25 Reduced height of protection Undercut angle of repose is steeper than original

21 Longitudinal Peaked Stone Toe Protection (LPSTP) Constructed of a well-graded, self-adjusting, self-filtering stone (no filter fabric underlayment) Live Siltation (willow) Original bank Constructed terraces with specific species vegetation (or combos) on each bench Backfill LPSTP

22 Looking DS, digging floodplain bench & placing soil along toe of right bank GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

23 Forming pile of stone into LPSTP, looking DS - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

24 Sloping upper bank - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

25 Final grooming and sloping of mid & upper bank - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

26 Andrew has a gully idea, Derrick is stunned - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

27 The cutting, toting, & planting crew, I mean the workshop participants GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

28 Live Siltation behind the LPSTP – Bend 1 GOODWIN CREEK–CONSTRUCTION-FEB 27, 2007–DANNY KLIMETZ

29 Planting RPM trees & shrubs planted at specific heights above the water GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

30 Soil was soft enough in places Live Stakes could be pushed in - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

31 Or slap a Sycamore with the trackhoe & release a thousand seeds GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

32 We talked the Pennington sales rep out of 4 bags of “Pennington SLOPEMASTER Mix” grass seed. This seed worked well in our application. Extreme upper bank was not as lush or robust as other areas. Possibly a lack of moisture issue? GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ

33 Rolling and spreading hay - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN

34 BEFORE & AFTERS OVER TIME BEND #1

35 Looking US, Feb 2007 - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

36 Looking US, working on it - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

37 Looking US – Construction Complete - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –NICK JOKAY

38 Looking US @ BEND #1 - One month later GOODWIN CREEK – ALMOST ONE MONTH – MAR 28, 2007 -DERRICK

39 Looking US @ Bend #1 – 2.5 months later GOODWIN CREEK – 2.5 MONTHS – May 18, 2007 – DAVE BIEDENHARN

40 Looking US @ Bend #1 – 4 months later GOODWIN CREEK – 4 MONTHS – July 3, 2007 – FROM DERRICK

41 2.4 YEARS LATER-Looking US @ Bend #1 – Rooted stock & pole plantings growing exceptionally well! 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

42 3.1 YRS LATER-Looking US @ project bank. Early in growing season & beavers have been busy. 3.1 YRS LATER-GOODWIN CREEK-PIX DERRICK 4-7-2010

43 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking US @ the project bank. Willows have roared back & other veg growth has been phenomenal

44 Looking US @ a Bendway Weir – Bend #1 – 4 months later GOODWIN CREEK – 4 MONTHS – July 3, 2007 – FROM DERRICK

45 Looking US from the ERR @ Bend #1 – 8 months later GOODWIN CREEK – 8 MONTHS LATER– NOV 12, 2007 – FROM DERRICK

46 Looking US @ Bend #1 – 8 months later GOODWIN CREEK – 8 MONTHS LATER– NOV 12, 2007 – FROM DERRICK

47 2.4 YEARS AFTER PROJECT COMPLETION Photos by Derrick JULY 3, 2009 BEND # 1

48 2.4 YEARS LATER-Looking DS @ constructed & vegetated stabilized bank in Bend #1. Most rooted stock plants are 6 to 18 ft tall. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

49 2.4 YEARS LATER-Looking DS @ constructed & vegetated stabilized bank in Bend #1. Most rooted stock plants are 6 to 18 ft tall. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

50 2.4 YEARS LATER-Upper bank Sycamore Live Stakes are growing well. Several are 6 to 12 ft tall. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

51 2.4 YEARS LATER-Sycamore Live Stakes growing well on upper third of bank (10 -12 ft above base flow water surface elevation) 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

52 2.4 YEARS LATER-Sycamore Live Stakes 6-10 ft tall. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

53 2.4 YEARS LATER- Sycamore Live Stakes growing well on upper third of bank (10-12 ft above base flow water surface elevation). Sycamore Live Stakes are 6-10 ft tall with robust growth. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

54 2.4 YEARS LATER-Looking US @ Bend #1 Rocked Riffle & vegged bank 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

55 2.4 YEARS LATER-Looking US @ Bend #1. Various planted species of trees & shrubs provide a robust riparian corridor. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

56 2.4 YEARS LATER-Looking US @ Bend #1. Minimal stone & robust plant growth provides shade, cover, & overhanging veg. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

57 2.4 YEARS LATER-Looking US @ Bend #1 right bank riparian veg. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

58 2.4 YEARS LATER-Looking US @ Bend #1 Bendway Weirs & vegged bank. Channel has deep pools & well-formed riffles. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

59 2.4 YEARS LATER-Looking US @ Bend #1 Bendway Weirs & 6-18 ft tall planted trees & shrubs. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

60 2.4 YEARS LATER-Looking DS @ Bend #1 right bank 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

61 2.4 YEARS LATER-Looking US @ LPSTP & plants in upper end of Bend #1 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

62 2.4 YEARS LATER-Looking DS @ Bend #1 LPSTP & BW. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

63 2.4 YEARS LATER-Looking DS @ upper end of Bend #1 LPSTP & BW. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

64 2.4 YEARS LATER-Looking DS @ US end of Bend #1 LPSTP & BW 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

65 2.4 YEARS LATER-Looking DS @ upper end of Bend #1 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

66 3.1 YEARS AFTER PROJECT COMPLETION Photos by Derrick APRIL 7, 2010 MR. BEAVER HAS BEEN BUSY

67 3.1 YRS LATER-Looking DS @ project bank. Early in growing season & beavers have been busy. 3.1 YRS LATER-GOODWIN CREEK-PIX DERRICK 4-7-2010

68 3.1 YRS LATER-Looking US @ project bank. Trees have not leafed out & beavers have been busy. 3.1 YRS LATER-GOODWIN CREEK-PIX DERRICK 4-7-2010

69 3.1 YRS LATER-Looking downhill @ the Engineered Rocked Riffle. 3.1 YRS LATER-GOODWIN CREEK-PIX DERRICK 4-7-2010

70 3.4 YEARS AFTER PROJECT COMPLETION Photos by Dave Derrick JULY 2, 2010 WHAT A DIFFERENCE 3 MONTHS MAKES!!

71 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking DS @ the project bank. Willows have roared back & other veg growth has been phenomenal

72 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking US @ the project bank. Willows have roared back & other veg growth has been phenomenal

73 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking DS @ the Engineered Rocked Riffle.

74 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking US @ the Engineered Rocked Riffle. Project is stable. Great pool-riffle-pool sequence.

75 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking US @ LPSTP & Bendway Weirs # 3 & # 2. Great pool-riffle-pool sequence!!

76 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking DS @ LPSTP & Bendway Weirs. Great overhanging veg (shade, cover, structure, insects)

77 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking DS @ BW #2, LPSTP, Live Siltation & other veg. Stable with high hydraulic roughness.

78 Early 1997 July 2009 Looking downstream, what a difference 2 years after the project was completed makes !!

79 Pre- and Post-Construction Surveys

80 Plant Survival…Post Project

81 BEND #2 LPSTP, a BOIL-UP POOL, BENDWAY WEIRS, LOG REVETMENT, & VEGETATION

82 PRE-PROJECT CONDITIONS

83 Looking US @ BEND #2 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –DANNY KLIMETZ

84 BEND # 2 CONSTRUCTION

85 Bend #2 Tieback/key- 1.0 ton/ft LPSTP- 1.0 ton/ft KEY Bendway Weirs-1.0 ton/ft Boil-Up Pool- 2.0 tons/ft Bendway Weir #1 Bendway Weir #2 Log Revetment

86 Looking at Bendway Weir #2 keyway in Bend #2 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

87 Close-up of key for Bendway Weir #2 in BEND #2 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

88 Toting a pole GOODWIN CREEK – CONSTRUCTION - FEB 2007 –DANNY KLIMETZ

89 Placing adventitious poles in the key PIX BY DANNY KLIMETZ

90 Looking across, Bendway Weir #2, key not backfilled yet - BEND #2 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK

91 PROJECT IS 8 MONTHS OLD Nov 12, 2007 BEND #2 MANY PLANTS ARE DORMANT Working from DS to US

92 Looking @ Bendway Weir #2, flow has flattened veg on top of BW, note deposition US & DS and willows growing US & in keyway GOODWIN CREEK – 8 MONTHS LATER– NOV 12, 2007 – FROM DERRICK

93 Close-up look @ Bendway Weir #2 – 8 months later GOODWIN CREEK – 8 MONTHS LATER– NOV 12, 2007 – FROM DERRICK Willows

94 Looking US, deposition between Bendway Weirs & great thalweg alignment – 8 months later GOODWIN CREEK – 8 MONTHS LATER– NOV 12, 2007 – FROM DERRICK

95 BEND # 2 2.4 YEARS AFTER PROJECT COMPLETION Photos by Derrick JULY 3, 2009

96 2.4 YEARS LATER-Looking DS @ Bend #2 Boil-Up pool, & Log. Left key & bank are all stable with vegetation growing. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

97 2.4 YEARS LATER-Looking US @ Bend #2. Log revetment stabilizes bank & provides aquatic habitat. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

98 2.4 YEARS LATER-Looking US @ Bend #2. Bendway Weirs have collected sediment proving a roughened vegged floodplain bench to stabilize the bank. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

99 2.4 YEARS LATER-Looking @ Bendway Weir #1 in Bend #2. Deposition & veg provides stabilization to bank. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

100 2.4 YEARS LATER-Looking @ Bendway Weir #2 in Bend #2. Deposition & veg provides stabilization to bank. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

101 2.4 YEARS LATER-Looking US @ Bendway Weirs # 1&2 in Bend #2. Nice vegged floodplain bench. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

102 2.4 YEARS LATER-Looking DS DS of Bend #2. Channel is not adversely affected by the US bank protection. 2.4 YEARS LATER-GOODWIN CREEK – FROM DERRICK-7-3-2009

103 3.4 YEARS AFTER PROJECT COMPLETION Photos by Dave Derrick JULY 2, 2010

104 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking US @ the project Bend #2. Stable and well vegged. Over 2 ft of sediment on top of Bendway Weirs.

105 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking across @ a Bendway Weir in Bend #2

106 3.4 YRS LATER-GOODWIN CREEK-PIX DERRICK 7-2-2010 3.4 YRS LATER-Looking US @ the log revetment.

107 The Bassett as a mountain lion


Download ppt "GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream."

Similar presentations


Ads by Google