Download presentation
Presentation is loading. Please wait.
Published byMarylou Lane Modified over 8 years ago
1
Jin Huang M.I.T. For Transversity Analysis Meeting Sept 10, 2009 @ JLab
2
Transversity Analysis Meeting Jin Huang 2
3
On BigBite side, normal Coinc Timing using track information to ◦ Selecting Scintillator Hit ◦ Calculating Path length correction Tracking-Free Coinc Timing needed for ◦ Study no-track events (a lot) ◦ Study photon-like event on BigBite and its asym. Calculated by ◦ Matching Largest Total Shower hit to Scintillator hits ◦ Calculating Path length base on shower/scint hit position Transversity Analysis Meeting Jin Huang 3
4
With Pion PID Cut on HRS No Cut on BigBite Side Background Higher : 2ns period pulse Transversity Analysis Meeting Jin Huang 4
5
With Proton PID Cut on HRS No Cut on BigBite Side Proton Peak Aligned to 0ns Transversity Analysis Meeting Jin Huang 5
6
Fit of TF CT VS good production/ref cell Run 10% of run replayed Stable Cross Running period Transversity Analysis Meeting Jin Huang 6 HRS Retiming Problem
7
Transversity Analysis Meeting Jin Huang 7 Matched PS/Sh Cluster All 0 Track Events Matched PS/Sh Cluster All 0 Track Events Event With valid TF CT Events with Cluster Event With valid TF CT Events with Cluster
8
Transversity Analysis Meeting Jin Huang 8
9
Scintillator are used to calculate CTs Its data quality never checked Although CT is shown to be stable Double check CT could unveil microscopic problems Checked with Production 3 / Skimmed Root Files, All runs ◦ All ADC/TDC mean value/RMS vs runs ◦ Track Timing Matching Efficiency Transversity Analysis Meeting Jin Huang 9
10
L1A Problems ◦ Solved Drop~10chan for all period ◦ Why? Left PMT #4 ADC break from 3480-3650 ◦ Should be little effect to CT Transversity Analysis Meeting Jin Huang 10
11
Transversity Analysis Meeting Jin Huang 11
12
TDC checked with T5 Cut ◦ Retiming Problems Solved Matching Efficiency to Track ◦ Low Eff During Retiming Problem Period ◦ Seeing two L1A problem Period Transversity Analysis Meeting Jin Huang 12
13
Transversity Analysis Meeting Jin Huang 13
14
Transversity Analysis Meeting Jin Huang 14
15
Transversity Analysis Meeting Jin Huang 15
16
Low ADC during Retiming Problem Period? HV Change in Jan (Recalibrated in DB) Bar 10 loose cable, 3480-3650 Random Gain Drop Around 5450? ◦ Most run with low statistic Transversity Analysis Meeting Jin Huang 16
17
Transversity Analysis Meeting Jin Huang 17
18
Transversity Analysis Meeting Jin Huang 18
19
TDC is stable ◦ Two Timing Adjustment, Automatically taken care of during CT calculation Matching Eff. To Tracks ◦ Low Matching Eff. at beginning of running? ◦ 0 Hit Effeciency ~ 5640 : F1 TDC DMA transfer terminated by unknown BUS Error http://www.jlab.org/~adaq/halog/html/0901_archi ve/090128024441.html http://www.jlab.org/~adaq/halog/html/0901_archi ve/090128024441.html Transversity Analysis Meeting Jin Huang 19
20
Transversity Analysis Meeting Jin Huang 20
21
Transversity Analysis Meeting Jin Huang 21
22
Scintillator is generally stable Few problems listed above Double check again after pass 4 Transversity Analysis Meeting Jin Huang 22
23
Transversity Analysis Meeting Jin Huang 23
24
Transversity Analysis Meeting Jin Huang 24
25
Transversity Analysis Meeting Jin Huang 25
26
Transversity Analysis Meeting Jin Huang 26
27
Transversity Analysis Meeting Jin Huang 27
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.