Presentation is loading. Please wait.

Presentation is loading. Please wait.

David Hitlin EMC R&D Meeting April 1, 2009 1 Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC.

Similar presentations


Presentation on theme: "David Hitlin EMC R&D Meeting April 1, 2009 1 Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC."— Presentation transcript:

1 David Hitlin EMC R&D Meeting April 1, 2009 1 Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC mounting structure Rear EC mechanical structure CsI(Tl) barrel refurbishment and modification Calibration system APD readout and preamps forward EC DAQ system Fast simulation GEANT4 simulation Beam test TDR chapter organization/editing

2 David Hitlin EMC R&D Meeting April 1, 2009 2 ItemContact person Mechanical design – forward EC Mechanical design – rear EC LYSO crystals APD readout package Electronics, DAQ & Trigger MDI and background Fast Simulation Full Simulation Contact persons

3 David Hitlin EMC R&D Meeting April 1, 2009 3 Beam test detailed schedule MilestoneDate Order LYSO crystals 0906 Test and characterize CMS APD packages Review design of TB structure Mount APD’s to crystals Complete TB structure Complete temp. control housing Complete DAQ system Insert crystals in structures and test In beam at Frascati


Download ppt "David Hitlin EMC R&D Meeting April 1, 2009 1 Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC."

Similar presentations


Ads by Google