Task Force 1: Protection against Water February 29th , 2016.

Similar presentations


Presentation on theme: "Task Force 1: Protection against Water February 29th , 2016."— Presentation transcript:

1 Task Force 1: Protection against Water February 29th , 2016

2 2 Outline 1 General information about TF1 2 TF1 working progress 3 Summary

3 3 TF1 working scope  To prevent the person from electric shock. TF1 working objective  To form the requirements in the GTR regulations. The working group No.MembersNo.Members 1Nha Nguyen (USA, NHTSA)12Mr. Brian Lawrence, JLR. 2Mr. Thomas Goldbach, GM13Alexandra MULOT, UTAC(France) 3Mr. Volker Rothe, GM14Mr. Olaf Boese, SK Continental 4Mr.Heiko Mertens (OICA, Volkswagen)15Mr. Karim Kortlaender 5Mr. Uwe Lachmund, VW16Mrs. Samarendra Triphathy, Renault 6Mr. Willi Josefowitz, VW17Mrs. Annika Tidblad, Scania 7 PaulineLejeune, PSA Peugeot Citroen ( OICA ) 18Mrs. Laura Schenk,Daimler 8Kazuya Ohzono(Japan, Honda)19Michael Guse, Daimler 9Mr. Masaaki Iwasaki, Toyota20Mr.Zhan Wenzhang, China, BAIC GROUP 10Mr. Takahiko Miki, Toyota21Mr.Chen Ping China,CHANGAN 11Mr. Naoki Kinoshita, Honda22Mr. ZhangTianqiang, China, FAW 1. General information about TF1

4 4  The 4th EVS meeting TF1 was set up.  The 5th EVS meeting TF1 discussed the requirements and test procedures of insulation resistance proposed by FAW(China).  The 6th EVS meeting EVS IWG asked TF1 draft a proposed text for inclusion in the draft GTR.  The 7th EVS meeting TF1 proposed draft to the EVS IWG.  The 8th EVS meeting TF1 experts reached an agreement about the draft except one open issue—detailed parameter of the flooding test procedure.  The 9th EVS meeting The flooding parameters were discussed (EVS-08-17e) but without reaching any agreement. REESS immersion test at pack level which was agreed to be discussed TF1. 2. TF1 working progress

5 5  The Brussels meeting The meeting chair concludes that the meeting discussion results in 4 possible options for TF1 moving forward: OPTION 1: Chinese present proposal as described by EVS-08-17 OPTION 2: US proposal to expand scope of the water exposure tests as described in EVSTF-06-06 OPTION 3: Postpone water requirements to phase 2 to allow time for research and a wider discussion of water exposure conditions, including immersion. OPTION 4: Make isolation resistance monitoring mandatory for all electric vehicles Action: China and Japan will be champions for OPTION 1 and provide rationale. USA will be champion for OPTION 2 OICA will champion OPTION 3,OICA will provide technical information and supporting evidence for the benefits of the isolation monitoring system. 2. TF1 working progress

6 6 Tokyo F2F meeting on Feb.29  All parties present the rationale  USA justify the expansion of the scope.  OICA share technical information and supporting evidence for the benefits of the isolation monitoring system.  Japan share some material on benefits of isolation resistance monitoring.  China provide rationale for Water Test.  All contract member's point about TF1  Agree : China and Japan agree to include in phase 1.  Not agree : EU think there were not any accidents caused by isolation failure , so there was no necessity to have water test.  Neutral : USA and Canada advice TF1 provide data and evidence to justify the “Protection against Water” necessity in the EVS 11th meeting. 2. TF1 working progress

7 7 3. Summary Key points of TF1 Discussion :  TF1 working Scope and Target: Identifying potential risk of electric shock caused by water, drafting the requirements for the GTR.  Washing and flooding are the representative examples of severe conditions in normal vehicle operation.  Isolation resistance value needs to be maintained in a range to prevent electric shock. When double isolation resistance failure occurs, it is possible that a person gets an electric shock.  Isolation monitoring system : detecting isolation loss, providing warning and inform driver to go to the service center for repairing.  The vehicle equipped with isolation monitoring systems, and the reliability of monitoring systems can be confirmed, normally by some standard as ISO 26262.  The vehicle equipped with isolation resistance monitoring systems. And the reliability of monitoring systems can not be confirmed  The vehicle wasn’t equipped isolation resistance monitoring systems.  China experts discussed China EV market situation :  Over the past two years big volume is already in the market, the data illustrating the isolation risk is not available yet.  China has certification system to regulate the OEM EV entire development action.