Deliverable Status Christian Esposito University of Napoli Federico II Christian.esposito@unina.it Naples, 25th January 2011
2
N APOLI, 12 TH J ANUARY 2010 D ELIVERABLE STATUS ::.. Deliverables in WP1 WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 1 P ROJECT M ANAGE - MENT CINI/UoN Prof. Stefano Russo T1.1 Scientific Management and Coordination Task Leader: Dr. Christian Esposito Reports (as in EC contract) FCTUC CSW SESM T1.2 Continuous TOK and Dissemination Task Leader: Dr. Christian Esposito D1.1: Continuous TOKJan 2010 D1.2: Dissemination PlanMay 2010 D1.3: CRITICAL STEP web siteMar 2010 D1.4: Five TOK workshops realized (report)May 2012 D1.5: Final TOK workshop (report)Mar 2013 T1.3 Recruitment and competence analysis Task Leader: Mrs. Francesca Matarese D1.6: Researchers RecruitedApr 2010 D1.7: TOK and staff exchange plans finalizedMay 2010 T1.4 Roadmap for future collaboration and R&D Task Leader: Mrs. Francesca Matarese D1.8: Preliminary roadmap for collaboration and R&D and durable knowledge network (Preliminary collaboration plan) Nov 2011 D1.9: Final roadmap for future collaboration and R&D and durable knowledge network (definitive collaboration plan) Mar 2013 T1.5 Financial and Admini- strative Management Task Leader: Dr. Christian Esposito Cost declarations and reports (as in EC contract)
3
[2]D ELIVERABLE STATUS WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 1 P ROJECT M ANAGE - MENT CINI/UoN Prof. Stefano Russo T1.1 Scientific Management and Coordination Task Leader: Dr. Christian Esposito Reports (as in EC contract) FCTUC CSW SESM T1.2 Continuous TOK and Dissemination Task Leader: Dr. Christian Esposito D1.1: Continuous TOKJan 2010 D1.2: Dissemination PlanMay 2010 D1.3: CRITICAL STEP web siteMar 2010 D1.4: Five TOK workshops realized (report)May 2012 D1.5: Final TOK workshop (report)Mar 2013 T1.3 Recruitment and competence analysis Task Leader: Mrs. Francesca Matarrese D1.6: Researchers RecruitedApr 2010 D1.7: TOK and staff exchange plans finalizedMay 2010 T1.4 Roadmap for future collaboration and R&D Task Leader: Mrs. Francesca Matarrese D1.8: Preliminary roadmap for collaboration and R&D and durable knowledge network (Preliminary collaboration plan) Nov 2011 D1.9: Final roadmap for future collaboration and R&D and durable knowledge network (definitive collaboration plan) Mar 2013 T1.5 Financial and Admini- strative Management Task Leader: Dr. Christian Esposito Cost declarations and reports (as in EC contract) N APOLI, 12 TH J ANUARY 2010 As presented in the previous TOK Meeting II, the main management deliverables have been submitted between March and June 2010. ::.. Deliverables in WP1
4
[3]D ELIVERABLE STATUS WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 1 P ROJECT M ANAGE - MENT CINI/UoN Prof. Stefano Russo T1.1 Scientific Management and Coordination Task Leader: Dr. Christian Esposito Reports (as in EC contract) FCTUC CSW SESM T1.2 Continuous TOK and Dissemination Task Leader: Dr. Christian Esposito D1.1: Continuous TOKJan 2010 D1.2: Dissemination PlanMay 2010 D1.3: CRITICAL STEP web siteMar 2010 D1.4: Five TOK workshops realized (report)May 2012 D1.5: Final TOK workshop (report)Mar 2013 T1.3 Recruitment and competence analysis Task Leader: Mrs. Francesca Matarese D1.6: Researchers RecruitedApr 2010 D1.7: TOK and staff exchange plans finalizedMay 2010 T1.4 Roadmap for future collaboration and R&D Task Leader: Mrs. Francesca Matarese D1.8: Preliminary roadmap for collaboration and R&D and durable knowledge network (Preliminary collaboration plan) Nov 2011 D1.9: Final roadmap for future collaboration and R&D and durable knowledge network (definitive collaboration plan) Mar 2013 T1.5 Financial and Admini- strative Management Task Leader: Dr. Christian Esposito Cost declarations and reports (as in EC contract) N APOLI, 12 TH J ANUARY 2010 ::.. Deliverables in WP1 Scope: Final description of all the TOK activities and secondments, and a preliminary roadmap for the Transfer of Knowledge among the project partners. Finalized in: 30 th July 2010
5
[4]D ELIVERABLE STATUS WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 2 Q UALITATIVE EVALUATION OF OTS ITEMS CSW Dr. Nuno Silva T2.1 Criteria for qualitative evaluation Task Leader: Mr. Ricardo Barbosa D2.1: Requirements for OTS items evaluation (report) Jun 2010 CINI/UoN FCTUC D2.2: Progress report and theoretical frame-work on OTS items classification and selection Aug 2010 T2.2 OTS items classification and selection Task Leader: Mr. Ricardo Barbosa D2.3: Guidelines to support software engineers during the OTS selection phase (for dissemination purposes) Dec 2010 WP 3 Q UANTITATIVE EVALUATION OF R OBUSTNESS AND D EPEND - ABILITY FCTUC Prof. Henrique Madeira T3.1 Quantitative evaluation at component level Task Leader: Prof. Marco Vieira D3.1: Quantitative methods for assessment of OTS software components Oct 2011 CINI/UoN CSW T3.2 Quantitative evaluation at system level Task Leader: Prof. Marco Vieira D3.2: Quantitative methods and procedures for assessment of OTS-based software systems Feb 2012 T3.3 Quantitative evaluation at system interconnection level Task Leader: Prof. Henrique Madeira N APOLI, 12 TH J ANUARY 2010 ::.. Deliverables in WP2
6
[5]D ELIVERABLE STATUS WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 2 Q UALITATIVE EVALUATION OF OTS ITEMS CSW Dr. Nuno Silva T2.1 Criteria for qualitative evaluation Task Leader: Mr. Ricardo Barbosa D2.1: Requirements for OTS items evaluation (report) Jun 2010 CINI/UoN FCTUC D2.2: Progress report and theoretical frame-work on OTS items classification and selection Aug 2010 T2.2 OTS items classification and selection Task Leader: Mr. Ricardo Barbosa D2.3: Guidelines to support software engineers during the OTS selection phase (for dissemination purposes) Dec 2010 WP 3 Q UANTITATIVE EVALUATION OF R OBUSTNESS AND D EPEND - ABILITY FCTUC Prof. Henrique Madeira T3.1 Quantitative evaluation at component level Task Leader: Prof. Marco Vieira D3.1: Quantitative methods for assessment of OTS software components Oct 2011 CINI/UoN CSW T3.2 Quantitative evaluation at system level Task Leader: Prof. Marco Vieira D3.2: Quantitative methods and procedures for assessment of OTS-based software systems Feb 2012 T3.3 Quantitative evaluation at system interconnection level Task Leader: Prof. Henrique Madeira N APOLI, 12 TH J ANUARY 2010 ::.. Deliverables in WP2 Scope: survey of applicable standards for software development and evaluation with the intent of defining requirements and metrics for the qualitative evaluation of OTS items. Finalized in: August 27th, 2010
7
P ROJECT P RESENTATION [6] WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 2 Q UALITATIVE EVALUATION OF OTS ITEMS CSW Dr. Nuno Silva T2.1 Criteria for qualitative evaluation Task Leader: Mr. Ricardo Barbosa D2.1: Requirements for OTS items evaluation (report) Jun 2010 CINI/UoN FCTUC D2.2: Progress report and theoretical frame-work on OTS items classification and selection Aug 2010 T2.2 OTS items classification and selection Task Leader: Mr. Ricardo Barbosa D2.3: Guidelines to support software engineers during the OTS selection phase (for dissemination purposes) Dec 2010 WP 3 Q UANTITATIVE EVALUATION OF R OBUSTNESS AND D EPEND - ABILITY FCTUC Prof. Henrique Madeira T3.1 Quantitative evaluation at component level Task Leader: Prof. Marco Vieira D3.1: Quantitative methods for assessment of OTS software components Oct 2011 CINI/UoN CSW T3.2 Quantitative evaluation at system level Task Leader: Prof. Marco Vieira D3.2: Quantitative methods and procedures for assessment of OTS-based software systems Feb 2012 T3.3 Quantitative evaluation at system interconnection level Task Leader: Prof. Henrique Madeira N APOLI, 12 TH J ANUARY 2010 ::.. Deliverables in WP2 Scope: Presentation of the OTS evaluation framework, based on the requirements indentified in D2.1. Finalized in: September 2nd, 2010
8
P ROJECT P RESENTATION [7] WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 2 Q UALITATIVE EVALUATION OF OTS ITEMS CSW Dr. Nuno Silva T2.1 Criteria for qualitative evaluation Task Leader: Mr. Ricardo Barbosa D2.1: Requirements for OTS items evaluation (report) Jun 2010 CINI/UoN FCTUC D2.2: Progress report and theoretical frame-work on OTS items classification and selection Aug 2010 T2.2 OTS items classification and selection Task Leader: Mr. Ricardo Barbosa D2.3: Guidelines to support software engineers during the OTS selection phase (for dissemination purposes) Dec 2010 WP 3 Q UANTITATIVE EVALUATION OF R OBUSTNESS AND D EPEND - ABILITY FCTUC Prof. Henrique Madeira T3.1 Quantitative evaluation at component level Task Leader: Prof. Marco Vieira D3.1: Quantitative methods for assessment of OTS software components Oct 2011 CINI/UoN CSW T3.2 Quantitative evaluation at system level Task Leader: Prof. Marco Vieira D3.2: Quantitative methods and procedures for assessment of OTS-based software systems Feb 2012 T3.3 Quantitative evaluation at system interconnection level Task Leader: Prof. Henrique Madeira N APOLI, 12 TH J ANUARY 2010 ::.. Deliverables in WP2 Scope: Provision of a sort of guideline for researchers and practitioners in the field of software systems design and development for LCCIs. Finalized in: not yet – Delay of 1 months!!!
9
N APOLI, 12 TH J ANUARY 2010 [8] ::.. Status Deliverable D2.3 What is missing? S TATUS D ELIVERABLE D2.3
10
N APOLI, 12 TH J ANUARY 2010 [9]S TATUS D ELIVERABLE D2.3 ::.. Status Deliverable D2.3 What is missing? The document requires reviews and possible remarks from participants to the project prior to its finalization. I kindly ask to each partner to identify the person responsible for reviewing the document and notify due to the end of the next week any remarks.
11
N APOLI, 12 TH J ANUARY 2010 [10]WP STATUS ::.. WP Status
12
N APOLI, 12 TH J ANUARY 2010 [11]WP STATUS ::.. WP Status WP3 started last August, with its task 3.1 – WP Leader: prof. Henrique Madeira, Task Leader: prof. Marco Vieira
13
N APOLI, 12 TH J ANUARY 2010 [12]WP STATUS ::.. WP Status WP4 started last October, with its tasks 4.1 & 4.2 – WP Leader: prof. Domenico Cotroneo, Task Leader: dr. Christian Esposito
14
[13]F UTURE D ELIVERABLES WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 3 Q UANTITATIVE EVALUATION OF R OBUSTNESS AND D EPEND - ABILITY FCTUC Prof. Henrique Madeira T3.1 Quantitative evaluation at component level Task Leader: Prof. Marco Vieira D3.1: Quantitative methods for assessment of OTS software components Oct 2011 CINI/UoN CSW T3.2 Quantitative evaluation at system level Task Leader: Prof. Marco Vieira D3.2: Quantitative methods and procedures for assessment of OTS-based software systems Feb 2012 T3.3 Quantitative evaluation at system interconnection level Task Leader: Prof. Henrique Madeira WP 4 T ECHNIQUES FOR ON - LINE FAULT DIAGNOSIS AND DYNAMIC RECONFIGURATI ON CINI/UoN Prof. Domenico Cotroneo T4.1 Detection and location mechanisms for diagnosing software faults Task Leader: Dr. Christian Esposito D4.1: State-of-the-art on fault diagnosis mechanism (report) Nov 2011 FCTUC CSW T4.2 Fault treatment and dynamic reconfiguration techniques Task Leader: Dr. Catello di Martino D4.2: Progress report on on-line diagnosis and reconfiguration techniques Mar 2012 N APOLI, 12 TH J ANUARY 2010 ::.. Future Deliverables
15
[14]F UTURE D ELIVERABLES WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 3 Q UANTITATIVE EVALUATION OF R OBUSTNESS AND D EPEND - ABILITY FCTUC Prof. Henrique Madeira T3.1 Quantitative evaluation at component level Task Leader: Prof. Marco Vieira D3.1: Quantitative methods for assessment of OTS software components Oct 2011 CINI/UoN CSW T3.2 Quantitative evaluation at system level Task Leader: Prof. Marco Vieira D3.2: Quantitative methods and procedures for assessment of OTS-based software systems Feb 2012 T3.3 Quantitative evaluation at system interconnection level Task Leader: Prof. Henrique Madeira WP 4 T ECHNIQUES FOR ON - LINE FAULT DIAGNOSIS AND DYNAMIC RECONFIGURATI ON CINI/UoN Prof. Domenico Cotroneo T4.1 Detection and location mechanisms for diagnosing software faults Task Leader: Dr. Christian Esposito D4.1: State-of-the-art on fault diagnosis mechanism (report) Nov 2011 FCTUC CSW T4.2 Fault treatment and dynamic reconfiguration techniques Task Leader: Dr. Catello di Martino D2.3: Guidelines to support software D4.2: Progress report on on-line diagnosis and reconfiguration techniques Mar 2012 N APOLI, 12 TH J ANUARY 2010 ::.. Future Deliverables Scope: Description of all the quantitative evaluation methods, providing a suitable solution to be used for estimating the dependability level of single OTS items, as well as of the entire software systems. Person in charge: prof. Marco Vieira
16
[15]F UTURE D ELIVERABLES WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 3 Q UANTITATIVE EVALUATION OF R OBUSTNESS AND D EPEND - ABILITY FCTUC Prof. Henrique Madeira T3.1 Quantitative evaluation at component level Task Leader: Prof. Marco Vieira D3.1: Quantitative methods for assessment of OTS software components Oct 2011 CINI/UoN CSW T3.2 Quantitative evaluation at system level Task Leader: Prof. Marco Vieira D3.2: Quantitative methods and procedures for assessment of OTS-based software systems Feb 2012 T3.3 Quantitative evaluation at system interconnection level Task Leader: Prof. Henrique Madeira WP 4 T ECHNIQUES FOR ON - LINE FAULT DIAGNOSIS AND DYNAMIC RECONFIGURATI ON CINI/UoN Prof. Domenico Cotroneo T4.1 Detection and location mechanisms for diagnosing software faults Task Leader: Dr. Christian Esposito D4.1: State-of-the-art on fault diagnosis mechanism (report) Nov 2011 FCTUC CSW T4.2 Fault treatment and dynamic reconfiguration techniques Task Leader: Dr. Catello di Martino D4.2: Progress report on on-line diagnosis and reconfiguration techniques Mar 2012 N APOLI, 12 TH J ANUARY 2010 ::.. Future Deliverables Scope: Overview of the state of the art on software faults diagnosis, and description of the proposed detection and location mechanisms, as well as the architecture of the proposed diagnosis engine. Person in charge: dr. Christian Esposito
17
N APOLI, 12 TH J ANUARY 2010 D ELIVERABLE STATUS ::.. Reports (1/2) WP L EADER TASKD ELIVERABLES M ONTH P ARTNER WP 1 P ROJECT M ANAGE - MENT CINI/UoN Prof. Stefano Russo T1.1 Scientific Management and Coordination Task Leader: Dr. Christian Esposito Reports (as in EC contract) FCTUC CSW SESM T1.2 Continuous TOK and Dissemination Task Leader: Dr. Christian Esposito D1.1: Continuous TOKJan 2010 D1.2: Dissemination PlanMay 2010 D1.3: CRITICAL STEP web siteMar 2010 D1.4: Five TOK workshops realized (report)May 2012 D1.5: Final TOK workshop (report)Mar 2013 T1.3 Recruitment and competence analysis Task Leader: Mrs. Francesca Matarese D1.6: Researchers RecruitedApr 2010 D1.7: TOK and staff exchange plans finalizedMay 2010 T1.4 Roadmap for future collaboration and R&D Task Leader: Mrs. Francesca Matarese D1.8: Preliminary roadmap for collaboration and R&D and durable knowledge network (Preliminary collaboration plan) Nov 2011 D1.9: Final roadmap for future collaboration and R&D and durable knowledge network (definitive collaboration plan) Mar 2013 T1.5 Financial and Admini- strative Management Task Leader: Dr. Christian Esposito Cost declarations and reports (as in EC contract) What about reports required by EC?
18
N APOLI, 12 TH J ANUARY 2010 R EPORTS [17] ::.. Reports (2/2)
19
N APOLI, 12 TH J ANUARY 2010 R EPORTS [18] ::.. Reports (2/2) On 22 nd Dec. 2010 we have submitted through SESAM the first Progress Report.
20
N APOLI, 12 TH J ANUARY 2010 R EPORTS [19] ::.. Reports (2/2) Within the end of this year, i.e., Dec. 2011, we have to finalize the second Progress Report.
21
N APOLI, 12 TH J ANUARY 2010 R EPORTS [20] ::.. Reports (2/2) Within Jan. 2012, we have to finalize the first Periodic Report.
22
N APOLI, 12 TH J ANUARY 2010 P ERIODIC R EPORT [21] ::.. Periodic Report (1/2) The periodic reports is composed of three distinct parts:
23
N APOLI, 12 TH J ANUARY 2010 P ERIODIC R EPORT [22] ::.. Periodic Report (1/2) The periodic reports is composed of three distinct parts: 1.An overview of work progress within the context of the objectives of the project, including milestones and deliverables identified within Annex I ("Description of Work") of the submitted project proposal. The report must include the differences between the work done and what was expected.
24
N APOLI, 12 TH J ANUARY 2010 P ERIODIC R EPORT [23] ::.. Periodic Report (1/2) The periodic reports is composed of three distinct parts: 1.An overview of work progress within the context of the objectives of the project, including milestones and deliverables identified within Annex I ("Description of Work") of the submitted project proposal. The report must include the differences between the work done and what was expected. 2.A justification for the use of resources, highlighting the costs incurred in each WP by subdividing cost kinds. It is necessary that man-months and costs indicated in this report match those from time-sheets and cost indications in Form C.
25
N APOLI, 12 TH J ANUARY 2010 P ERIODIC R EPORT [24] ::.. Periodic Report (1/2) The periodic reports is composed of three distinct parts: 1.An overview of work progress within the context of the objectives of the project, including milestones and deliverables identified within Annex I ("Description of Work") of the submitted project proposal. The report must include the differences between the work done and what was expected. 2.A justification for the use of resources, highlighting the costs incurred in each WP by subdividing cost kinds. It is necessary that man-months and costs indicated in this report match those from time-sheets and cost indications in Form C. 3.Form C (i.e., financial statements) for each beneficiary, a CFS for each beneficiary (required only in certain cases) and a Summary Financial Report based on information from each Form C.
26
N APOLI, 12 TH J ANUARY 2010 P ERIODIC R EPORT [25] ::.. Periodic Report (1/2) The periodic reports is composed of three distinct parts: 1.An overview of work progress within the context of the objectives of the project, including milestones and deliverables identified within Annex I ("Description of Work") of the submitted project proposal. The report must include the differences between the work done and what was expected. 2.A justification for the use of resources, highlighting the costs incurred in each WP by subdividing cost kinds. It is necessary that man-months and costs indicated in this report match those from time-sheets and cost indications in Form C. 3.Form C (i.e., financial statements) for each beneficiary, a CFS for each beneficiary (required only in certain cases) and a Summary Financial Report based on information from each Form C. Mandatory when requested EC contribution exceeds 375K €.
27
N APOLI, 12 TH J ANUARY 2010 P ERIODIC R EPORT [26] ::.. Periodic Report (2/2) Let us give a look at the budget simulator table: CINIFCTUCCSWSESM Requested Contribution 228.674,80 €72.671,80 €478.729,83 €472.490,53 €
28
N APOLI, 12 TH J ANUARY 2010 P ERIODIC R EPORT [27] ::.. Periodic Report (2/2) Let us give a look at the budget simulator table: CINIFCTUCCSWSESM Requested Contribution 228.674,80 €72.671,80 €478.729,83 €472.490,53 € They must provide a CFS when the project ends. Costs related to obtain a CFS are eligible and must be indicated as related to management.