Download presentation
Presentation is loading. Please wait.
Published byAda West Modified over 8 years ago
1
The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Dimas Dimitrios 1 st EU Mid-Term Review Meeting 7 November 2014
2
Scope of Work Work on WP1: Prototype Construction & Production Validation Firmware design for the AMB SLP Board Project:Event:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 1 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318
3
The AMBoard Project:Event:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 2 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318
4
Scope of Work Data from all detector layers must be synchronized in order to be for the same event (same collision) Need of Monitoring Module for detection of Loss of Synchronization Project:Event:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 3 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Hit Bus0 Hit Bus2 Hit Bus9 Hit Bus10 Hit Bus11 Hit Bus1 FIFO Dual Clock GTP RX Module Data Processing & Monitoring GTP TX Module FIFO Dual Clock HIT_BUS SYSTEM_CLO CK RX_GTP_CL OCK TX_GTP_CLO CK Paralleliz ed Data FIFO VME
5
Loss of Sync Module Design Specs Events every 10μs (100KHz) Data input from 12 buses 16-bit words in each bus Comparison of all the End Event words with the End Event Reference word The End Event reference word is the word of the first bus (bus no 0) Project:Event:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 4 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 End Event Words Hit Bus0 Hit Bus2 Hit Bus9 Hit Bus10 Hit Bus11 Hit Bus1
6
Loss of Sync Module Block Diagram Project:Event:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 5 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Hit Bus 16 Hit Bus 16 Hit Bus 16 Hit Bus 16 clk init init_ev ee_flag_cc current_state_status EndEventRef HBSErrors ee_comp_rslt ee_error_flag ee_flag ee_error_flag_reg HBS0_LoS_Counter HBS11_LoS_Counter clk init init_event_control 2 16 12 8 8 Output Signals Error Counter for each bus Error Flag 12-bit Loss of Sync corresponding to each bus
7
Trainings Summer School 2013 @ Pisa. “VHDL Design” Training at CAEN on July 2013 June 2014. Training on Embedded Systems (EDK & SDK of Xilinx) @ AUTH The Serial Link Processor for the Fast TracKer (FTK) processor at ATLAS @ TIPP2014 (International Conference on Technology and Instrumentation in particle Physics), Amsterdam Authors: P. Luciano, A. Annovi, A. Andreani, et al Project:Event:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 6 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Publications
8
The collaboration with the people at INFN in Pisa & at Physics Dpt in AUTH during the two secondments was more than fruitful Trainings on VHDL design & on Embedded Systems, as well as my work on the HIT chip development was a perfect opportunity to boost up my Embedded Systems design knowledge & experience. Great chance to widen my business network, both in academia and private sector. Project:Event:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 7 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Current Task (2 nd secondment) Conclusions The co-development of the freeze logic for the Spy Buffers (more details on next presentation)
9
Thank you for the Attention!!! Project:Εκδήλωση:Date:PlacePresenterConfidential 324318-FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 8 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: 324318
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.