Download presentation
Presentation is loading. Please wait.
Published byJade French Modified over 8 years ago
1
Connecting Eastside and Victoria Leisure Centre - Update St Ann’s and Dales Area Committee Presentation September 2010
2
Background Connecting Eastside will deliver a new public square including a market and events space at Sneinton Market, together with improvements to improve connections between the city centre and the eastside of the city, Sneinton and St Ann’s. Redevelopment of Victoria Leisure Centre will provide a new and modern Leisure Centre facility providing swimming pools, a fun children’s splash pool area, fitness and dance spaces and new health suite.
3
Highway Works – Connecting Eastside Connecting Eastside will radically improve pedestrian links between the city centre, Sneinton and St Ann’s in the Eastside area, while improving transport links for cyclists and traffic too. The highway works commenced in January 2010 and are on-going until spring 2011.
4
Sneinton Market – Connecting Eastside The redevelopment of Sneinton Market aims to create a new public space that will be a venue for markets, gatherings, events, performances, festivals and community use. Extensive stakeholder and public consultation took place in late 2009 and April 2010. A positive response to the design proposals was received.
5
Sneinton Market Design – Connecting Eastside The design includes: Granite paving recreating the historic layout of the market buildings. Seating Trees A water feature made up of a series of lined water jets.
6
Insert visual
8
Public Art As part of the project the architect has involved artist, Neville Gabie. Neville has developed ideas with the local community to incorporate public art into the square. Central to the work is the concept of food.
9
Public Art Proposals Planting scheme – Nottingham Medlar Trees - Planting of fruit trees in the square for communal use. Text in the paving - Working with local writer Wayne Burrows to develop engraved text to be included in the paving scheme for the square. Local Artist Commissioning Programme - Local artists will be working with Neville, contributing to a programme of events in 2011.
10
Examples of text and local fonts
11
Programme There is close working with the Victoria Leisure Centre project team. Construction works on the Square are due to commence in January 2011. Programmed completion of the Square is due in late 2011.
12
Victoria Centre Site Hoardings
13
Demolition
14
Victoria Leisure Centre & Sneinton Square
15
Shared Pool and Fountain Plant Room
16
Programme / Timetable Enabling works complete by Sept 2010. Substructure Excavate /Foundations March 2011. Pool Construction April starts 2011. Superstructure starts June 2011. Practical Completion end February 2012. Client fit out March 2012. Open Public March/April 2012.
17
Programme Ground Floor First Floor
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.