1
“702 KAR 4:160, Capital construction process” 1
2
To be developed as procedures document for K-12 school construction projects Allows KDE to update specific procedures, when needed KDE to form Committee of Stakeholders for annual review 2
3
Added statutes: KRS Chapter 45A, 156.074, 156.076, 156.496, 156.670, 157.450, 157.455, 160.476, 322.010, 323.010, 323.033, 323A.010, 371.405(7), 371.410, 424.260 3
4
Added: change event; construction documents; contractor; design professional; GESC; KBE; major renovation; minor project; qualified provider Removed (utilize statute definitions): Architect; contract documents; division; KERA; moveable equipment Expanded: emergency; fixed equipment; record documents 4
5
Added: Guaranteed Energy Savings Contracts (GESC) Removed: Items to send to KDE and justification info Revoking BG-1 for inactivity Reworded eligible projects from DFP KDE process BG-1 in 30 days (instead of 60 days) Minor & major project Superintendent can notify KDE for emergencies 5
6
Added: site acquisition; lease info (from plans & specs section); certificate of liability insurance (from architectural services); GESC oversight Removed: model space requirements (listed in section 6) Reworded/Moved: Lease info (from plans & specs section); Certificate of liability insurance (from architectural services) Design professional services & CM oversight Bid process defined in statute Simplified oversight of construction administration and construction contract close-out Use contract for liens 6
7
Added: language in place of AIA specific docs: “prepare and provide documents and services required by contract, laws, and industry standards as prescribed by the AIA. The KDE may request clarification on documentation which does not comply.” Removed: specific AIA docs; KDE contract approval criteria specifics; streamlined design professional submission list (full list of submissions to be listed in Best Practices); “giving consideration” language Reworded/Moved: Moved board responsibilities and submissions to Section 3 Used similar language for design professional services as in CM Board-approved term used 7
8
Added: language in place of AIA specific docs: “prepare and provide documents and services required by contract, laws, and industry standards as prescribed by the AIA. The KDE may request clarification on documentation which does not comply.” Removed: specific AIA docs; KDE contract approval criteria specifics; streamlined CM submission list (full list of submissions to be listed in Best Practices); number of months for construction phase Reworded/Moved: Moved board responsibilities and submissions to Section 3 Used similar language for CM as in design professional services 8
9
Added: Entrance and right–of-way improvements from Kentucky Transportation Cabinet Removed : formal submission of board minutes; specific list of construction documents; performance specs Reworded/Moved: Increased maximum gross areas of Model Program Space 115% for elementary (formerly 110%) 120% for middle & high (formerly 115%) Reformatted list of agency notifications Moved lease info to Section 3 9
10
New section added to regulation Section 8 – Construction Bidding, Bond Sale, & Contracting Added over 10% Removed: Bid specific directions Reworded/Moved: List of document submissions for all projects and additional list of document submissions for projects that are bid Note: GESC projects are not bid 10
11
Added: KDE approval is based on contingency amount available Removed: AIA document reference; Language is “Board-approved changes in the contract scope of work shall be submitted using industry standard forms, including the KDE Change Order Supplemental Information Form…” Reworded/Moved: Cumulative cost submission; increased change order approval amount to $25,000 (from $7,500) 11
12
Added: Reference to statutes Removed: AIA document reference Section 11 – Construction Dispute Resolution Updated: utilize contract language 12
13
Added: summary of all purchase orders and change orders for each contract Section 13 – Penalties No change 13
14
Added: RFP for GESC KDE Purchase Order Summary Form Removed: AIA documents Reworded/Moved: List is in alphabetical order 14
15
Added: Project Name and Site Address Building ID Number Construction Delivery Method District’s Procurement Standard Removed: Page 2 – Program Space Square Footage Board Order Attachment Not Required (District to Maintain) Reworded/Moved: Page 3 – Proposed Plan to Finance Application becomes Page 2 15
16
Added: Project Type Section Energy Efficient Design Section (KRS 157.450 and KRS 157.455) Energy Efficient Design Features Lists Selection List Removed: Board Order Attachment Not Required (District to Maintain) 16
17
Added: Board of Education Designee Signature Removed: Board Order Attachment Not Required (District to Maintain) 17
18
Added: Page 2 – Project Closeout Section D – Project Completion & Inventory Update Section E – Reconciliation of Final Project Cost Removed: Board Order Attachment Not Required (District to Maintain) 18
19
Added: Ranges for larger projects: $5M - $10M = 5.6% $10M - $20M = 5.5% $20M - $30M = 5.4% $30M - $40M = 5.3% $40M - $50M = 5.2% $50M - $60M = 5.1% $60M+ = 5.0% Removed: Deleted embedded A/E Max Fee Guidelines document from RFP for A/E Services document A/E Max Fee guidelines Form is now stand-alone document Reworded/Moved: Reformatted header and footer 19
20
Added: Cost tracking table, including contingency balance Cost breakdown table for labor, materials, profit, overhead Signatures of District Finance Officer, Architect, & CM Reworded/Moved: Reformatted project descriptor information Cost breakdown detail to be included for Change Orders => $25K (used to be for all Change Orders) Reformatted header and footer 20
21
Added: Ranges for larger projects: $10M - $30M = 1.9% $30M - $60M = 1.8% $60M+ = 1.7% Removed: Deleted embedded CM Max Fee Guidelines document from RFP for CM Services document CM Max Fee guidelines Form is now stand-alone document Deleted range for projects starting at $1M with 5.75% fee Reworded/Moved: Condensed ranges, retaining higher Reformatted header and footer 21
22
Removed: KDE Material Supplier Authorization Form Purchase Order Form Do not allow additional supplemental pages to be included Reworded/Moved: General formatting and clarification changes Allows submission of 10 alternate bids (used to be 4) Allows submission of 40 subcontractors, suppliers/manufacturers, and unit prices (used to be 10) Allows submission of 50 purchase orders Reformatted header and footer 22
23
Added: Purchase Order name and address Billing and Shipping addresses 48-hour notification to contacts for receipt of goods Removed: Notary signature Reworded/Moved: General formatting and clarification changes Reformatted header and footer 23
24
Added: Notary signature line Reworded/Moved: Update to be generic for use by A/E, CM, and GESC Qualified Provider Reformatted header and footer 24
25
Added: BG # and Project Name Specification Section Vendor Phone and Email Bill To Information Contact Information for Delivery to Jobsite Purchase Order Terms & Conditions Removed: Category Number Reworded/Moved: School Changed to Facility Name Purchaser Changed to Requested By 25
26
New form added Provides list of all Direct Purchase Orders made by district 26
27
Added: Additional firm identification info Experience with KDE School Funding Documents Utilized with Contract Certification with signature Removed: Appendix and attachments (documents are referenced) AIA specific document numbers Reworded/Moved: General formatting and clarification changes Clarified professional liability insurance requirement Reformatted footer 27
28
Added: Additional firm identification info, including overview of firm Experience with KDE School Funding Documents Utilized with Contract Removed: Appendix and attachments (documents are referenced) AIA specific document numbers Reworded/Moved: General formatting and clarification changes Clarified professional liability insurance requirement Reformatted footer 28
29
New form added Provides districts with standard RFP document to request GESC project proposals 29