Presentation is loading. Please wait.

Presentation is loading. Please wait.

EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10.

Similar presentations


Presentation on theme: "EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10."— Presentation transcript:

1 EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10

2 EIS Science Operation Science -Team core science -Initial science targets -Proposal from users Preparation for EIS Science Operation Check of Obs. Table using PM Observation in orbit Downlink stations (USC, SVAL) JAXA data storage (DARTS) Data Reformat EGSE Data check - Obs. table - S/C CMDs Analysis Outcome ISACS-PLN Uplink station Spacecraft Merging EIS SO in S/C operation EIS Planning EGSE (EISCO) Final S/C plan Observation Planning Data for analysis Level0 data Level2 data Telemetry Plan approved for EIS operation Data centers Users Feedback Line selection Exp. duration Compression FOV size etc. Data rate Compression Instrument CAL Feedback eis_prep for level0- to-level1 conversion is ready in SSW.

3 Observation Proposals See details in http://solar-b.nao.ac.jp/operation_e/proposal_e.shtml To broaden community involvement in the Hinode mission the science team is offering the opportunity to participate in the definition and development of the observing program. This can take the form of either collaborative investigations with other ground or space based observatories or a request for a set of observational sequences to meet a specific scientific objective formulated by the requestor. To facilitate this program the Hinode team has created a group of seven Scientific Schedule Coordinators (SSCs) to both review requests and assist requestors in preparing their plans. It is the policy of the Hinode Science Working Group that all observing requests that are consistent with the objectives of Hinode will be accepted. However it is strongly recommended that individuals discuss their proposed observations with one of the SSCs before preparing and formally submitting their request to ensure that their proposed observations are not already part of the core team's program. Please note that having your observation program selected and implemented does NOT entitle you to exclusive use of the data. The Hinode open data policy applies to all data. Where the observation program involves more than one instrument, the requestor should contact an SSC associated with his primary instrument. 55 Hinode Operation Plans (HOP) have been proposed.

4 Planning Constraints Nominal allocation of telemetry for EIS is 50 kbps. A study with higher data rate cannot run for a long time. The 24 hour planning period begins around 11 UT Hinode daily planning meetings occur at 01:30 UT 2-day weekend plans begin at around 11 UT Saturday Hinode is re-pointed every ≈ 6 hours for the XRT synoptics –an EIS study should be < 6 hours in duration Pointing information is needed for the daily meeting one day before the observations –small pointing adjustments are possible at the daily meeting on the observation day

5 Science Schedule Coordinators Chief Coordinators John M. Davis (john.m.davis (at) nasa.gov) Tetsuya Watanabe (watanabe (at) uvlab.mtk.nao.ac.jp) Scientific Schedule Coordinators - Instrument Specific Solar Optical Telescope (SOT) –Tom Berger (berger (at) lmsal.com) –Takashi Sekii (sekii (at) solar.mtk.nao.ac.jp) X-Ray Telescope (XRT) –Leon Golub (Golub (at) head.cfa.harvard.edu) –Kiyoto Shibasaki (shibasaki (at) nro.nao.ac.jp) EUV Imaging Spectrometer (EIS) –Len Culhane (jlc (at) mssl.ucl.ac.uk) –Tetsuya Watanabe (watanabe (at) uvlab.mtk.nao.ac.jp) –John Mariska (mariska (at) nrl.navy.mil)

6 For A New EIS Observation See details in http://solar.bnsc.rl.ac.uk/~young/solarb_eis/eis_study_guide.htmlhttp://solar.bnsc.rl.ac.uk/~young/solarb_eis/eis_study_guide.html A sequence of observation is called ‘Study’ in the EIS plan. A ‘Study’ consists of ‘Rasters’. A ‘Raster’ contains a ‘Line List’. Line Lists, Rasters, and Studies are created by users using software, EIS Planning Tool, in SSW (solar software). EIS Planning Tool http://msslxr.mssl.ucl.ac.uk:8080/SolarB/PlanningTool_v3.0.jsp

7 Flow of EIS Observations Prepare a Study using SSW by proposers. A Study file in the text format is sent to MSSL. e-mail to Khalid Al-Janabi: kfj@mssl.ucl.ac.uk The Study is verified by the EIS proto-models at MSSL. The Study is registered in the EIS official database in SSW. The Study is set in a daily plan by EIS chief observers at ISAS. EIS in orbit observes the sun according to the Study description.

8 Preparation of EIS Observations Create Line Lists and Rasters –Can select and modify Line Lists and Rasters that have been registered in the official database. –IDL> eis_mk_raster Create Studies –Can select Rasters that have been registered in the official database. –IDL> eis_mk_study Create Daily Plan at ISAS by EIS CO –IDL> eis_mk_plan

9 IDL> eis_mk_raster

10 IDL> eis_mk_study

11 Timeline


Download ppt "EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10."

Similar presentations


Ads by Google