Alignment Work Completed for 10/29 – 11/02 Main Injector 6 Days Contact Task ManagerStarting DateEnding DateCrew Assigned Layout of 30 Sector As per new Beam Sheet. Extraction Line2 Days Cons Gattuso X6331 Babatunde OshinowoOctober 29, 2012November 2, 2012 Mike O'Boyle, Chuck Wilson, Randy Wyatt. MicroBoone1 Days 6608 Alignment support and QC during the assembly of the TPC wire chamber frame at DAB. VIRGIL BOCEANOctober 29, 2012November 2, 2012 Craig Bradford, Randy Wyatt, Gary Teafoe. RFQ2 Days Support installation of RFQ 2 Day Babatunde OshinowoOctober 29, 2012November 2, 2012 Chuck Wilson, Bradford, Gary Crutcher. MTA2 Days 6600 Align the MTA beam line as per beam sheet mta_diag_10 7 4 3_sagcor_25_Jul2012_MOD-2-1 2 DayJim Volk Babatunde OshinowoOctober 29, 2012November 2, 2012 Chuck Wilson, Craig Bradford, Gary Crutcher. Mike O'Boyle, Randy Wyatt, Gary Teafoe. Civil2 Days 6617 Install new (floor and walls) control and transfer precision coordinates underground inside the LArTF building (currently has visibility to surface) for future construction QC and future beam layout. Please verify access to site and hazard analysis with Tim Trout 630 453-2209 cell phone.1 DayTim Trout VIRGIL BOCEANOctober 29, 2012November 2, 2012 Craig Bradford, Randy Wyatt, Gary Teafoe. 6618 Check contractor points and/or layout inside the LArTF building. Ask Tim Trout for contractor point list. Please verify access to site and hazard analysis with Tim Trout 630 453-2209 cell phone.1 DayTim Trout VIRGIL BOCEANOctober 29, 2012November 2, 2012 Craig Bradford, Randy Wyatt, Gary Teafoe. Mis 1.5 Day 6433 Reference 7 new profile monitors (which utilize the FNAL design rotary vacuum cans) for installation in the NuMI primary beam at PM- 107, PM-108, PM-112, PM-114, PM-115, PM-117, PM-TG 1 Day ROB REILLYVirgil BoceanOctober 29, 2012November 2, 2012Teafoe New Beam sheet required Delayed Completed Completed Phase One Completed Second set after lift Completed Two more. No more are ready
2
Alignment Work Schedule for 11/05 – 11/09 Main Injector 2 Days Contact Task ManagerStarting DateEnding DateCrew Assigned Layout of 30 Sector As per new Beam Sheet. Extraction Line2 Days Cons Gattuso X6331 Babatunde OshinowoNovember 5, 2012November 9, 2012 Mike O'Boyle, Chuck Wilson, Randy Wyatt. MicroBoone1 Days 6608 Alignment support and QC during the assembly of the TPC wire chamber frame at DAB.1 Day VIRGIL BOCEANNovember 5, 2012November 9, 2012 Craig Bradford, Randy Wyatt, Gary Teafoe. RFQ2 Days Support installation of RFQ 2 Days Babatunde OshinowoNovember 5, 2012November 9, 2012 Chuck Wilson, Bradford, Gary Crutcher. Mis 2 Days 6433 Reference 7 new profile monitors (which utilize the FNAL design rotary vacuum cans) for installation in the NuMI primary beam at PM- 107, PM-108, PM-112, PM-114, PM-115, PM-117, PM-TG 1 DayROB REILLYVirgil Bocean November 5, 2012November 9, 2012 Teafoe 6524 Stake out PXIE (Project X) cave at CMTF building on floor - 2 days 1 Day KERMIT CARLSONVirgil Bocean November 5, 2012November 9, 2012 Chuck Wilson, Bradford, Gary Crutcher. 6617 Install new (floor and walls) control and transfer precision coordinates underground inside the LArTF building (currently has visibility to surface) for future construction QC and future beam layout. Please verify access to site and hazard analysis with Tim Trout 630 453-2209 cell phone.1 DayTim Trout VIRGIL BOCEAN November 5, 2012November 9, 2012 Craig Bradford, Randy Wyatt, Gary Teafoe. 6612 E906/NM Layout end of steel stickers on the floor of NM1 for NM1Q1 and NM1Q2. Beam sheet submitted to John Kyle.1 Day MICHAEL GEELHOED John Kyle November 5, 2012November 9, 2012 Craig Bradford, Randy Wyatt, Gary Teafoe.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.