Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.

Similar presentations


Presentation on theme: "The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept."— Presentation transcript:

1

2

3 The Construction Process

4 TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept

5 Virtual Construction™ Process change design: change quantities total duration productivity building completion procurement status site logistics delivery date materials, equipment budget driven design knowledge base, trends, classifications availability of “crews and cranes” preferred suppliers and sub contractors, payments estimated versus actual costs and man hours Virtual Building design model

6

7 Team Ltd Customers Byggnadsekonomi AB Trinidad Partnership The Wall Street Journal 2005 Technology Innovation Awards

8 Strategic Business Systems ERP for Construction Strategic Planning Meets Business Strategic Planning and Control Systems ERP for Construction

9 Design, Plan and Build Design Estimating Scheduling Enterprise Analysis Procurement Control Purchasing Accounting Save Information Progress Control What materials and sub contractors? What are the plans? Productivity? Which resources? Actions? Labor hours? What did it cost? What can we learn? Sequence? When are materials needed? Design PlanBuild

10 Company Knowledge Enterprise Analysis Impact Analysis Enterprise Resources Benefits

11 Summary Virtual Building TM 5D Construction ERP


Download ppt "The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept."

Similar presentations


Ads by Google