1 1. General Information 1) Space (1) Land Space : 80Kft2 (2) Building Area : 75Kft2 ← 2 story-building(Partially 3 floors) 2) Construction Lead Time : 11Months (Aug. 2000 to June 2001) 3) Facilities (1) Ware house - Raw Material Warehouse : Room for CRT 20,000 Pcs Storage - Finished Product Warehouse : (2) Production Line : Total 5 Lines - PCB Ass'y : 1 Line - TFT-LCD Ass'y : 1 Line - Set Ass'y & Adjustment : 3 Lines * In-line system : Burn-in, Touch Integration, Packing * Burn-In Room : 480Pcs of Monitors with aging time 72Hrs
2
2 2. Production Capacity Description Factory Old New CRT TFT-LCD Total Number of Lines Capacity Number of Lines Capacity 3 (1) 4 15 (5) 30 2 (2) 5 4 (2) 5 17 (7) 35 (Unit:K/month) * ( ) : Rental / OEM Factory 1 (1) 1
3
3 Assembly Line Assembly Packing Out Input Outgoing Inspection Input out Outgoing Inspection Material warehouse 2 nd Floor PCB Ass ’ y Line TFT-LCD Ass ’ y Line 3. Production Process 1 st Floor
4
4 3. Production Process Assembly Line Inspection Packing Burn-in Room Out going Inspection Input Assembly Line Inspection Packing Warehouse (Raw Material) Incoming Inspection Production Preparation Input Touch Integration Touch Integration OutOut 1 st Floor Warehouse (Finished Products) * Yellow colored line is only for IGT