Presentation is loading. Please wait.

Presentation is loading. Please wait.

DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.

Similar presentations


Presentation on theme: "DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system."— Presentation transcript:

1 DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system features and interface definitions affecting multiple organizations Local systems design and requirements material (Tower, AOC, FAA) Detailed system features and interface definitions affecting individual organizations Local procedures (Tower, AOC, Flight Deck) Detailed procedures affecting individual organizations Flight Deck Guidance Detailed aircrew procedures affecting multiple organizations

2 How do we manage this? – We are already on a path for ONE set of documents for all of Phase 1 – We need baseline documents for any Phase currently in progress Includes all documents in the hierarchy set Provides the baseline for trouble-shooting (procedural and system) Provides the baseline for metrics and reporting Provides the baseline for anyone wanting to add – We need baseline documents for any future Phase Includes all documents in the hierarchy set Provides procedural and system design baseline Provides a means for metrics and reporting to convert from one Phase to the next Provides a means for tracking operational and system changes from one Phase to the next – We should really be doing one for the Operational Phase (TDLS) – We will do this by carrying specific document versions, for each Phase Phase 1: Version 1.x documents. Phase 2: Version 2.x documents

3 Limited Trial for Revenue Service DTAP Out of Service for Upgrade Full Functionality Trial (Procedure Shake- Out) Full Functionality Trial (120d Safety Period) 22-Jan-1310-Feb-134-Mar-134-Apr-134-Aug-13 SUCCESS CRITERIA 1.Functional and Ops E to E checkout 2.E to E document verification UM79, 80 and CAF 3.Validated by dedicated crew, controller and dispatcher SUCCESS CRITERIA 1.Full Service Validation 2.Validated by technical dispatcher, flight crews and controllers 3.Local interview based data collection 4.Questionnaires SUCCESS CRITERIA 1.Validated by line controllers, pilots and dispatchers 2.Integrated into daily Ops 3.Log Based Statistical Analysis 4.Volpe interviews 5.Questionnaires


Download ppt "DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system."

Similar presentations


Ads by Google