Download presentation
Presentation is loading. Please wait.
Published byGarey French Modified over 8 years ago
1
Administrative Computing Capabilities
2
For each objective: Define 1 - 3 year targets Define 3+ year targets Refine policy, activities, budget constraints The Challenge Keep it simple, on task Dove-tail with other sub-committee work Start by defining our baseline
3
WAN – wide-area-network; connections between locations, sometimes spanning public pathways for data traffic. LAN – local-area-network; connections inside buildings for localized data traffic. SAILOR – wireless WAN infrastructure provided by MD Public Library System. BTOP – Broadband Technology Opportunities Program a.k.a. “The Fiber Grant” through MD Department of IT. SAN – Storage Area Network; larger, faster storage primarily used in virtualized infrastructures. IPS/AV – Intrusion Prevention Service/Anti-virus; firewall (edge) services to keep the bad guys out. SaaS (cloud computing) – Software-as-a-Service; subscription paid services, someone else hosts infrastructure. SIS – Student Information System (Power School). CIMS – Comprehensive Information Management for Schools. CIPA – Children’s Internet Protection Act.
4
WAN Wireless WAN via SAILOR – multiple shared sites, limited by bottlenecks @ tower sites (22Mb shared by 6 schools) Cable access (5 schools) – 50Mb down / 5Mb up BTOP – start 2012, 1Gb expected/site, 4 schools remain on cable modem LAN Wired - $150,000 capacity upgrades in progress (~22% completed out of 1,629 drops planned) Wireless – 100% administrative and instructional coverage, however, equipment outdated
5
Hardware Aging switches, firewalls Servers – SAN in the data center, 90% virtualized, no disaster recovery site Services Security (IPS/AV) Traditional: Email, Content filtering (CIPA) Cloud Services (SaaS) – AESOP, MaintenanceDirect, SchoolMessenger, SchoolPay, SchoolCash.net, MD K-12 Digital Databases, SchoolDude, MD Online IEP Integrated Data Systems – Including: SIS, payroll, financial data, Human Resources, employee benefits, procurement, fixed assets, purchasing, transportation
6
MSDE Targets (2007-2012) 100:1 – Instructional Staff-t0-Instructional Tech Resource Teachers 300:1 – Computers-to-Full Time Tech Support Technician 40:1 – Servers-to-Full Time LAN Administrator 25:1 – Sites-to-Full Time WAN Administrator CCPS Current State 1,381:0 – Instructional Resource Teachers (FY11 ~307:1 FY12 ~ 0) ~ MSDE equivalent = 13 FTE 912:1 – Computers-to-Technicians (7,295:8) ~ MSDE equivalent = 24 FTE 113:1 – Servers to LAN Administrators (113:1) ~ MSDE equivalent = 2 FTE 30:1 – Sites to WAN Administrators (30:1) ~ MSDE equivalent = 1 FTE
7
Administrative Computing Capabilities Expand SAN for additional virtualization needs. Be aware that we need to be able to work and collaborate at any time, therefore our infrastructure must be flexible. Train our workforce to collaborate using available tools like Sharepoint. Examine the replacement of our CIMS product and lay the foundation to migrate to a newer product or platform. Integrate mobile devices into administrative functions. Develop informational dashboards and other reporting tools that focus information to improve decision making.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.