Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector
2
Procurement Guidance Documents Part A:Rural Water Modulw (DBO) Part B:Small Wastewater Projects Part C:Small Water Supply Projects Part A:Rural Water Modulw (DBO) Part B:Small Wastewater Projects Part C:Small Water Supply Projects
3
Chapter 12: Conventional Procurement for GWSS
4
Prior to Group employing Consulting Engineer Local Authority will (a)Prepare Brief (b)Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction. Prior to Group employing Consulting Engineer Local Authority will (a)Prepare Brief (b)Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction.
5
Scale of fees: (a)Fee per member for preparation of design drawings and calculations still valid. (b)Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c)PSDS accures separate fee. (ACEI scale of fee dated 9/2/96) Scale of fees: (a)Fee per member for preparation of design drawings and calculations still valid. (b)Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c)PSDS accures separate fee. (ACEI scale of fee dated 9/2/96)
6
L. Doyle One Price Three Prices National Newspapers OJEU The Procurement “Goalposts” OJEU National Newspapers Three Prices One Price Waste Water Directive 04/18/EC Waste Water Directive 04/18/EC Water Directive 04/17/EC Water Directive 04/17/EC
7
L. Doyle One Price Three Prices National Newspapers OJEU The Procurement “Goalposts” Waste Water Directive 04/18/EC Waste Water Directive 04/18/EC Water Directive 04/17/EC Water Directive 04/17/EC
8
Water Quality Water Conservation Water Quality Water Conservation
9
New & Upgrade(85%) Takeover(100%) New & Upgrade(85%) Takeover(100%)
10
DBO Civil (85%) M&E(100%) DBO Civil (85%) M&E(100%)
11
Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding