Download presentation
Presentation is loading. Please wait.
Published byNigel Johns Modified over 8 years ago
1
Illinois Space Society Dan Regan 2012 - 2013 Tech Meeting
2
2012-2013 Goals for this meeting Go over projects in more detail Create lists of project interest Determine which additional projects may be worked on Set initial timeline for projects Determine interest in leadership positions
3
2012-2013 NASA USLI Design and build a high power rocket and UAV quadrotor payload!
4
2012-2013 USLI Subgroups Structures: Build, test, and simulate the rocket Payload: Design, build, program UAV, science payload Recovery: Work on rocket recovery hardware, altimeters, ejection charges, etc.
5
2012-2013 USLI Dates/Deadlines Notification Selection: Sept 27 This fall: organize teams, build and test rocket and UAV, prepare for competition and the spring. Next semester: Finish payload, have a complete test launch with working payload, travel to Huntsville for the competition (April 17-21)
6
2012-2013 NASA Microgravty University Design a zero gravity experiment to fly on NASA’s microgravity plane Project led by Dan Regan
7
2012-2013 Microgravity University NASA JSC in Houston, TX “Systems Engineering” NASA selects a handful of different projects We apply for our favorites with a short essay and team resumes
8
2012-2013 Microgravity University This is an exclusive project Nationals only There will be an application process to join the team Extremely fun and an incredible Experience, and a teal research opportunity. Email regan10@illinois.edu
9
2012-2013 Micrograv Dates Letter of Intent: Sep 12 Proposal: Oct 24 Selection Notification: Dec 5 Flight week June 20
10
2012-2013 NASA RASC-AL Create a full mission architecture for a NEA, Lunar, or Mars mission, or create a thorough design for a supporting element Top teams will present their ideas to NASA and other industry members in Florida next June
11
2012-2013 RASC-AL Dates/Deadlines Notice of Intent by Nov 9 Proposal: January 19 Selection Notification: Feb 8 15 Page Technical Report: Due May 31 June 17-20: Forum in Florida For more information, visit http://www.nianet.org/RASCAL/2013-Program- Info.aspx
12
2012-2013 Additional Tech Projects Please vote for no more than 2! High Altitude balloon Two stage rocket High altitude rocket Some projects that may become available in the future are AAS Payload project, GMSGC rocket, or SEDS rocket
13
2012-2013 Leadership positions A number of projects still need managers, including: NASA RASC-AL Any of the non competition projects
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.