Locknetics Project Update Semester 2, Week 5 Justin Gilstrap Akin Olugbade Lutalo Webb.

Similar presentations


Presentation on theme: "Locknetics Project Update Semester 2, Week 5 Justin Gilstrap Akin Olugbade Lutalo Webb."— Presentation transcript:

1 Locknetics Project Update Semester 2, Week 5 Justin Gilstrap Akin Olugbade Lutalo Webb

2 Materials Update Resistors –.25 watt power rating – Tolerance: 5% – Have been collected from EECE Labs (as have transistors) Diodes (investigation with A.B. Bonds) – IN4148/1N914: Same diode – 1N5232 Zener diode Digikey A2096 DB-9 Connector – Out of Stock on DigiKey.com Meeting with Lewis on 2/10/09 to discuss options with local vendors – Axial electrolytic capacitor – 1N5232 Zener Diode

3 Meeting with Lewis iButton on CIP Module – Used once or twice yearly Obtained tracking information for banana plugs – Ground shipping (5-7 business days) – Should arrive on Thursday

4 Next Steps Final checking and ordering of PCB Hands on familiarization of crimping techniques Research and acquisition of heat shrink tubing cables Materials meeting with Lewis tomorrow