Download presentation
Presentation is loading. Please wait.
Published byOswin Barton Modified over 8 years ago
1
Paddy’s Flats Construction laydown area (Total Disturbance 12.8ha)
2
Paddy’s Flats area before construction
3
Paddy’s Flats – Construction of work area. Note the bulldozer pushing the material to prepare for crushing/screening
4
Paddy’s Flats – Construction. Note stockpiles of screened gravels and aggregate for road building and concrete Stockpiles of screened gravel
5
Paddy’s Flats – Stockpiles of screened gravel (ground view of different sizes)
6
Paddy’s Flats – More stockpiles along road ready for next phase of construction
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.