1 EAST Vertical Control 1-13-07 to 1-24-07 D. Mueller, GA Control Group and EAST Team

2 PLAN: SHAPED PLASMAS AND VERTICAL CONTROL All EAST’s external coils are superconducting First use of Internal Coils, IC,( Two coils, 2 turns each, normal conductor connected in series) Used GA’s PCS MIMO for control IC was used to control vertical position in feedback mode Z was from matrix of Mirnovs and Flux loops

3 PCS WAS RUN AT 20 kHz Initial start-up at 1kHz –1 ms response, Power Supplies 4kA/ms When used in feedback for vertical control - 2 kHz oscillation Increased PCS rate to 20 kHz First use of higher rate in anger –0.28 ms system latency –0.35 ms rise time (3db point) similar to filters on PCS digitizer input Vertical growth time of plasma was 2 ms, measured when control was turned off

4 Movie of ~3 s duration plasma Open-loop shape control ramped from roughly circular at 1.5s to disruption


Download ppt "EAST Vertical Control 1-13-07 to 1-24-07 D. Mueller, GA Control Group and EAST Team."