Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Straw Polls Results Date: 2013-12-02 Authors:

Similar presentations


Presentation on theme: "Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Straw Polls Results Date: 2013-12-02 Authors:"— Presentation transcript:

1 Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Straw Polls Results Date: 2013-12-02 Authors:

2 Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 2 Abstract This submission summarizes the results of the HEW straw polls and provides a detailed SG timeline

3 Submission doc.: IEEE 11-13/1493r0December 2013 Osama Aboul-Magd (Huawei Technologies) Slide 3 SP #1 What type of PAR do you prefer? (choose one) 1. Qualitative PAR that includes words like “improve”, “higher”, “better”, etc. 2. Quantitative PAR that includes words like “x times improvement”. Etc. Majority is for quantitative PAR How to find the percentage improvement in metric(s) of interest?

4 Submission doc.: IEEE 11-13/1493r0 SP #2 Slide 4Osama Aboul-Magd (Huawei Technologies) December 2013 How many performance metrics should be included in the PAR scope? (choose one) 1. One metric 2. Two metrics 3. More than two metrics

5 Submission doc.: IEEE 11-13/1493r0 SP #3 If one performance metric, which metric should be included in the PAR scope? (choose one) 1. Link throughput (bps) 2. Area throughput (bps/m2) 3. Per STA throughput (bps) 4. Frame delay (msec) 5. Frame delay variations (jitter) (msec) 6. Power efficiency Slide 5Osama Aboul-Magd (Huawei Technologies) December 2013 Clear preference of per STA throughput and are throughput as performance metrics Both metrics are dependant on each other

6 Submission doc.: IEEE 11-13/1493r0December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 6 SP #4 If more than one metric, which metrics should be included in the PAR scope? (Choose more than one) 1. Link throughput (bps) 2. Area throughput (bps/m2) 3. Per STA throughput (bps) 4. Frame delay (msec) 5. Frame delay variations (jitter) (msec) 1. Power efficiency The result is consistent with SP #3 result

7 Submission doc.: IEEE 11-13/1493r0 Detailed Timeline Slide 7Osama Aboul-Magd (Huawei Technologies) December 2013 DecJanFebMarch Dec 4 Telecon Dec 18 Telecon January Meeting Jan 19-24 Reach consensus on PAR March Meeting March 16-21 IEEE 802 EC Meeting Deadline for the PAR To be on the EC Agenda PAR Editing IEEE 802 WGs comments HEW Tutorial TG in May/July

8 Submission doc.: IEEE 11-13/1493r0 References Slide 8Osama Aboul-Magd (Huawei Technologies) December 2013


Download ppt "Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Straw Polls Results Date: 2013-12-02 Authors:"

Similar presentations


Ads by Google